My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BLDG 40-51 2023-06-15
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-51
>
3003 W CASINO RD BLDG 40-51 2023-06-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2023 9:04:59 AM
Creation date
6/15/2023 8:34:36 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-51
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
O.A. <br />90 PSIG <br />5 <br />90 PSIG <br />SUPPLY <br />N.C. U PAIN I BUO I H HUH <br />SPRAYING APPLICATIONS <br />1 <br />CSnV <br />0XO <br />Ln <br />w <br />GENERAL NOTES: <br />A. REFER TO DRAWINGS M310U FOR <br />SEQUENCE OF OPERATION ASSOCIATED <br />WITH THIS CONTROL DIAGRAM. <br />B. ALL TCV'S SHALL BE SUPPLIED WITH <br />POSITIVE POSITIONERS. <br />C. WHERE THE TERM "EXISTING FACILITY <br />ENERGY MANAGEMENT SYSTEM" IS USED, <br />REFERENCE IS BEING MADE TO THE <br />HONEYWELL DELTA 52DO SYSTEM LOCATED <br />IN THE 40-11 BUILDING. <br />D. SEE DRAWING M2b FOR CONTROL SYSTEM <br />SYMBOLS, ABBREVIATIONS, AND NOTES. <br />E. CONTROL WIRING SHALL BE INSTALLED PER <br />SPECIFICATION SECTION 15975. <br />F. COMPRESSED AIR SHALL BE OBTAINED AND <br />INSTALLED PER SPECIFICATION SECTION <br />15975. <br />SPECIFIC NOTES: <br />3 JW E:> NOT USED. <br />3'bo.(u SETPOINT FOR THIS TEMPERATUR <br />TRANSMITTER_ IS _39 OF <br />® FILTER CHANGE OUT SETPOINT IS <br />THIS EXHAUST FAN IS TYPICAL FOR <br />EF-37 & EF-38. <br />© THIS SUPPLY FAN IS TYPICAL FOR <br />SF-8 THROUGH SF -I I. EACH HEAT <br />RECOVERY UNIT ENCLOSURE INCLUDES <br />TWO SUPPLY FANS. BOTH FANS SHALL <br />BE CONTROLLED BY ONE VFD. <br />NOT USED. <br />® THESE HEATING COILS ARE TYPICAL <br />FOR HC1 AND HC2. <br />j'♦i [1> NOT USED. <br />XHAUST <br />AIR <br />0 THIS PREHEAT COIL IS TYPICAL FOR <br />PHC1 AND PHC2. <br />HUMIDITY TRANSMITTER IS REQUIRED <br />PER VERTICAL PAINT BOOTH. <br />2 SEE SHEET M6 FOR VALVE SIZE. <br />3 LIQUID SENSOR ALARM PANEL. SEE <br />SHEET 1 E61 FOR LOCATION OF PANEL. <br />[7> WHEN A LEAK IS DETECTED BY THE LEAK <br />DETECTION MONITORING SYSTEM SPECIFIED <br />IN SECTION 15421 THROUGH MISCELLAN— <br />EOUS RELAY ALARM XXA0XX01, THIS <br />ALARM CONDITION SHALL BE INDICATED AT <br />THE EXISTING FACILITY ENERGY MANAGEMENT <br />SYSTEM. CONTROLS CONTRACTOR SHALL <br />COORDINATE WITH THE LEAK DETECTION <br />MONITORING SYSTEM MANUFACTURER FOR <br />INTERFACE REQUIREMENTS. <br />CONSTRUCTION NOTES <br />RECALIBRATE AND REPROGRAM <br />TEMPERATURE TRANSMITTER TO ONLY <br />REPORT OUT TEMPERATURE ON VISUAL <br />-ICF1I IIVU iviUUt - - --- UUr\t IVIUUt DISPLAY. <br />SPT1 20 °F 3 XXO1 7 XXO1 <br />(B <br />CURE MODE PROVIDE STEAM HEATING COIL, PIPING, <br />AND VALVES AND CONNECT INTO EXISTING <br />STEAM PIPING AS INDICATED. <br />REFERENCE POINT <br />INSIDE PAINT BOOTH <br />�r ERENCE POINT <br />SIDE PAINT BOOTH <br />COMPRESSED AIR SUPPLY <br />PdIT I PAINT BOOTH/BUILDING <br />AMBIENT <br />N.C. TO PAINT BOOTH FOR <br />5 XXO DIFFERENTIAL PRESSURE <br />INDICATION <br />SPRAYING APPLICATIONS <br />VERTICAL- PAINT BOOTH CONTROL- DIAGRAM SPT-0.05" W.G. <br />p <br />ISSUED FOR CONSTRUCTIONPROFESSIONAL <br />STAMP &SIGNATURE NEERS <br />APPLIES TO WORK WITHIN THE CLOUDED Seattle H Spokane H Baltimore <br />DESIGN BY FSi DATE 06.27.2022 <br />REVISION AREAS ONLY AS INDICATED <br />SYM <br />REVISION <br />BY <br />APPROVED <br />DATE <br />SYM <br />REVISION <br />BY <br />APPROVED <br />DATE <br />ACCEPTABILITY <br />DRAWNC.TOLVER <br />6T19-92 <br />SUBTITLE <br />VERTICAL PAINT BOOTH <br />CURRENT REVISION <br />SYMBOL <br />DATE <br />�� wAq� <br />THIS DESIGN AND/OR <br />CONTROL DIAGRAM <br />W5523782 <br />RECORD DWG. - LOCKWOOD GREENE <br />03/94 <br />CHECKED <br />SHEET <br />M 310 <br />® <br />BOE//V" <br />1:s� <br />y <br />329 x <br />? <br />fSSIONAL�ENG\ <br />SPECIFICATION IS APPROVED <br />R. RODEMS <br />8-92 <br />A <br />767 VERTICAL PAINT BOOTH VENTILATION W5523782 <br />FSi <br />KMC <br />06.18.2021 <br />ENGINEER <br />ENGINEER <br />SH <br />6-19-92 <br />TITLE <br />767 VERTICAL PAINT BOOTH VENTILATION — PHASE 2 <br />BUILDING 40-051 <br />APPROVED BY <br />DEPT. <br />DATE <br />B <br />767 VERTICAL PAINT BOOTH VENTILATION -PHASE 2W5523782 <br />FSi <br />KMC <br />06.27.2022 <br />CHECKED <br />D.ROBY <br />8-19-92 <br />JOB N0. <br />94049.01/31329.04 <br />COMPND. <br />APPROVED <br />0&27.M'� <br />J.S HOPKINS <br />9-11-92 <br />MECHANICAL MASTER COL. EVERETT, <br />WA <br />H LR ROTZER <br />9-11-92 <br />DWG NO. 40-051—M310 <br />sm <br />
The URL can be used to link to this page
Your browser does not support the video tag.