My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brown and Caldwell Inc. 6/15/2023 Amendment 2
>
Contracts
>
6 Years Then Destroy
>
2024
>
Brown and Caldwell Inc. 6/15/2023 Amendment 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2023 1:34:34 PM
Creation date
6/15/2023 1:34:19 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brown and Caldwell Inc.
Approval Date
6/15/2023
Council Approval Date
6/14/2023
End Date
12/31/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
0002939
Public Works WO Number
WO3755
Amendment/Change Order
Amendment
Amendment/Change Order Number
2
Tracking Number
0002939
Total Compensation
$291,521.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 7 <br />City of Everett Contract No. 156839 <br />Water Filtration Plant Portal 4 Improvements Design Contract Scope of Services <br />Everett Water Filtration Plant Portal 4 Improvements Design <br />Amendment 2 <br />Project Understanding <br />This Portal 4 Improvements Amendment 2 scope of work extends the existing design contract with <br />Brown and Caldwell to include project changes requested under the Project Management and <br />Services During Construction phases. These phases are updated to include the addition of an access <br />vault on the Portal 3 and Portal 5 intertie pipeline. The request for this work was made via email on <br />March 23, 2023. The following document summarizes the scope and level of effort for developing <br />the design documents and services during construction for the requested improvement. <br />Scope of Work Summary and Work Breakdown Structure <br />The Consultant scope of work includes two project phases, which are identified in the following table. <br />The proposed budget for this work is presented in Exhibit A. <br />Amendment 2 - Portal 3 and Portal 5 Intertie Access Vault Phase Summary <br />Phase 100 Project Management <br />Phase 700 Services During Construction <br />Phase 100 Project Management <br />Activities/Approach: Provide management, direction, coordination, and control of all project work, <br />and associated management of project scope, schedule, budget, technical quality, and monthly <br />progress reports and invoices. This task includes the following activities: <br />Supervise project staff and manage consultant team, budget, and schedule. <br />Conduct bi-weekly project check in calls with City’s project manager (PM) to review project <br />status, schedule, and other project management related issues. <br />Maintain the PMP including scope, schedule, and budget. <br />Maintain the project risk register and action, issues and decision logs to aid in collaborative <br />decision making. <br />Prepare monthly project status reports. Progress reports will identify budget status, progress <br />status, activities of the previous month, and up-coming activities. <br />Conduct bi-weekly calls between BC’s Project Manager (PM) and the Everett’s PM to review <br />project status, schedule, contract issues, and other project management related issues. <br />Everett Responsibilities <br />Participate in the project meetings. <br />Review monthly status reports and supporting project documentation for invoice and payment <br />approval.
The URL can be used to link to this page
Your browser does not support the video tag.