My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brown and Caldwell Inc. 6/15/2023 Amendment 2
>
Contracts
>
6 Years Then Destroy
>
2024
>
Brown and Caldwell Inc. 6/15/2023 Amendment 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2023 1:34:34 PM
Creation date
6/15/2023 1:34:19 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brown and Caldwell Inc.
Approval Date
6/15/2023
Council Approval Date
6/14/2023
End Date
12/31/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
0002939
Public Works WO Number
WO3755
Amendment/Change Order
Amendment
Amendment/Change Order Number
2
Tracking Number
0002939
Total Compensation
$291,521.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett Water Treatment Plant Portal 4 Improvements | Amendment 2 Scope of Work <br />Page 2 of 7 <br />Task Assumptions <br />PM meetings will be by conducted virtually and will occur bi-weekly with a duration of <br />approximately 30 minutes. <br />Meetings <br />Biweekly PM calls for the duration of project. <br />Work Products <br />Monthly progress reports and invoices. <br />Submittal of updated project logs as needed to support key activities and decisions (risk register, <br />action/issue/decision logs). <br />Phase 700 Vault Design and Services During Construction <br />Activities/Approach: Develop design drawings and specifications for the construction of an access <br />vault on the Portal 3 and Portal 5 intertie pipeline. This work includes the following activities: <br />Review 1997 Portal 3 and Portal 5 intertie design documents. <br />Develop design drawings showing plan, section, and details for the installation of a new valve <br />vault on the Portal 3 and Portal 5 intertie pipeline. The vault will provide access to two ports <br />installed along the crown of the 54-inch diameter pipeline. The ports are assumed to be installed <br />approximately 8 feet apart. BC will design a single vault structure spanning the two ports. The <br />design will include a ladder and non-traffic rated entry ways and covers. The anticipated list of <br />drawings includes the following sheets: <br />o (1) Intertie vault plan <br />o (1) Intertie vault sections <br />o (1) Intertie vault details <br />Develop valve vault specifications. Design documents will reference the Portal 4 Improvements <br />conformed specification set or specify materials on drawings whenever possible. The anticipated <br />list of specifications includes the following: <br />o 03 48 11 Precast Concrete Vaults <br />o 05 53 10 Ladders <br />o 05 59 00 Hatches <br />Conduct internal design document QAQC. <br />Address City review comments. <br />Finalize and seal drawings for delivery. <br />Coordinate submittal and RFI communication. <br />Review project submittals during construction. <br />Respond to technical RFIs during construction. <br />Everett Responsibilities <br />Provide design documents from the 1997 construction of the Portal 3 and Portal 5 intertie <br />pipeline. <br />Review and provide comment on draft design documents. <br />Provide site photos as needed. <br />Coordinate City or Contractor provided certified survey elevations of the pipeline crown and <br />grade.
The URL can be used to link to this page
Your browser does not support the video tag.