My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brown and Caldwell Inc. 6/15/2023 Amendment 2
>
Contracts
>
6 Years Then Destroy
>
2024
>
Brown and Caldwell Inc. 6/15/2023 Amendment 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2023 1:34:34 PM
Creation date
6/15/2023 1:34:19 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brown and Caldwell Inc.
Approval Date
6/15/2023
Council Approval Date
6/14/2023
End Date
12/31/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
0002939
Public Works WO Number
WO3755
Amendment/Change Order
Amendment
Amendment/Change Order Number
2
Tracking Number
0002939
Total Compensation
$291,521.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett Water Treatment Plant Portal 4 Improvements | Amendment 2 Scope of Work <br />Page 3 of 7 <br />Task Assumptions <br />The design will be completed in two submittals. A draft set of drawings will be provided to the <br />City for review and comment. Following the City’s review, BC will address comments and finalize <br />the design documents. <br />Draft design documents will be delivered to the City four weeks following amendment approval. <br />Final design will be submitted two weeks after receiving City review comments. <br />Design drawings will be prepared in 2D AutoCAD and adhere to the City’s CAD standards. <br />Drawings will be signed and sealed by a Professional Engineer licensed in the State of <br />Washington. <br />The proposed budget assumes the review of three submittals – precast concrete vault shop <br />drawings, ladders, and hatches. <br />The proposed budget assumes the review of two RFIs. <br />No geotechnical work will be completed as part of this scope of work. <br />City or Contractor to provide certified survey elevations of the crown of the intertie pipeline and <br />grade elevation. <br />This work does not include development of a cost estimate. <br />This work will be completed under existing project phase 702 Services During Construction and <br />a new project Phase 703 Vault Design as outlined in Exhibit B. <br />Work Products <br />Draft design drawings and specifications. <br />Stamped and sealed final design drawings and specifications. <br />CAD files of design drawings. <br />Attachments <br />Exhibit A Amendment Budget Summary <br />Exhibit B Project Budget Summary
The URL can be used to link to this page
Your browser does not support the video tag.