Laserfiche WebLink
City of Everett Water Treatment Plant Portal 4 Improvements | Amendment 2 Scope of Work <br />Page 3 of 7 <br />Task Assumptions <br />The design will be completed in two submittals. A draft set of drawings will be provided to the <br />City for review and comment. Following the City’s review, BC will address comments and finalize <br />the design documents. <br />Draft design documents will be delivered to the City four weeks following amendment approval. <br />Final design will be submitted two weeks after receiving City review comments. <br />Design drawings will be prepared in 2D AutoCAD and adhere to the City’s CAD standards. <br />Drawings will be signed and sealed by a Professional Engineer licensed in the State of <br />Washington. <br />The proposed budget assumes the review of three submittals – precast concrete vault shop <br />drawings, ladders, and hatches. <br />The proposed budget assumes the review of two RFIs. <br />No geotechnical work will be completed as part of this scope of work. <br />City or Contractor to provide certified survey elevations of the crown of the intertie pipeline and <br />grade elevation. <br />This work does not include development of a cost estimate. <br />This work will be completed under existing project phase 702 Services During Construction and <br />a new project Phase 703 Vault Design as outlined in Exhibit B. <br />Work Products <br />Draft design drawings and specifications. <br />Stamped and sealed final design drawings and specifications. <br />CAD files of design drawings. <br />Attachments <br />Exhibit A Amendment Budget Summary <br />Exhibit B Project Budget Summary