My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 01 90 - 1 <br /> Inductive Charging Infrastructure for Everett Transit <br /> SECTION 01 01 90-OWNER FURNISHED MATERIALS <br /> PART 1 -GENERAL <br /> 1.1 SUMMARY <br /> A. Description <br /> 1. Work of this Section includes coordination, transportation/receipt, storage, <br /> and installation of the equipment items and materials that will be furnished by <br /> the Owner for installation by the Contractor, as shown on the Contract <br /> Drawings and as specified herein: <br /> a. Four(4)flush mounted inductive charging coils manufactured <br /> by InductEV/ Momentum Dynamics. <br /> b. One (1) 300KW Inductive Charger Cabinet <br /> 2. Should the Owner identify other materials available for use by the Contractor, <br /> the Contractor shall inspect those proposed items and if acceptable will be <br /> responsible to coordinate their transportation, refurbishment, storage, and <br /> installation. The Contractor and the Owner shall agree to refurbishment <br /> standards for each item. <br /> 4. The Contractor, upon acceptance of materials, shall be responsible for <br /> Owner furnished materials until they are incorporated in the work and have <br /> been accepted by the Construction Manager. <br /> 5. The Construction Manager shall have the right to access the areas where <br /> Owner furnished materials are stored. <br /> 6. The Contractor shall ensure that all permits necessary for storage area use <br /> have been obtained. <br /> B. Related Sections <br /> 1. 01 11 00 - Summary of Work <br /> 2. 01 30 00 -Submittals <br /> 2. 01 31 00- Project Schedules <br /> 1.2 SUBMITTALS: Submittals shall be made in accordance with the requirements of <br /> Section 01 30 00 Submittals, except as modified herein. <br /> A. Submit a Receipt and Report of received items within 7 days of receipt. <br /> 01 01 90 - 1 OWNER FURNISHED MATERIALS <br />
The URL can be used to link to this page
Your browser does not support the video tag.