My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 11 00 -4 <br /> Inductive Charging Infrastructure for Everett Transit <br /> good condition as existed before commencing work. <br /> 3.4 LAYOUT OF WORK <br /> A. The Contractor shall layout the work and shall be responsible for all measurements <br /> in connection with the layout. The Contractor shall furnish all stakes, templates, <br /> platforms, equipment, tools, materials, and labor required to lay out any part of the <br /> work. The Contractor shall be responsible for executing the work to the lines and <br /> grades that may be established or indicated in the approved construction <br /> documents. The Contractor shall also be responsible for maintaining and <br /> preserving all stakes and other marks established. <br /> B. Establish and plainly mark center lines for new work, and such other lines and <br /> grades that are reasonably necessary to properly assure that location, orientation, <br /> and elevations established for each such structure are properly located and <br /> coordinated and comply with lines and elevations indicated. <br /> 3.5 TESTS <br /> A. Conduct final tests required in various sections of specifications. The Contractor <br /> shall furnish all labor, materials, equipment, instruments, and forms, to conduct <br /> and record such tests. <br /> B. Individual test result of any component,where required, will only be accepted when <br /> submitted with the test results of related components and of the entire system. <br /> END OF SECTION 01010 <br /> 01 11 00 -4 SUMMARY OF WORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.