Laserfiche WebLink
City of Everett 01 11 00 - 3 <br /> Inductive Charging Infrastructure for Everett Transit <br /> fulfilled. <br /> PART 2—PRODUCTS(NOT USED) <br /> PART 3 -EXECUTION <br /> 3.1 TESTING: Before placement and installation of work that is subject to testing, the <br /> Contractor shall notify the Construction Manager. Such prior notice shall not be less than <br /> 3 workdays unless otherwise designated by the Construction Manager. Manufacturers and <br /> suppliers of materials fabricated off-site and subject to specified testing shall providethe <br /> same prior notices. <br /> 3.2 PROTECTION OF EXISTING VEGETATION,STRUCTURES, EQUIPMENT, UTILITIES <br /> AND IMPROVEMENTS <br /> A. The Contractor shall preserve and protect all structures, equipment, and <br /> vegetation (such as trees, shrubs, and grass)on or adjacent to the work site, which <br /> are not to be removed and which do not unreasonably interfere with the work <br /> required under this contract. The Contractor shall avoid damaging vegetation that <br /> will remain in place. If any limbs or branches of trees are broken during contract <br /> performance, or by the careless operation of equipment, or by workers, the <br /> Contractor shall prune those limbs or branches in accordance with best <br /> arboricultural practices as directed by the Construction Manager. <br /> B. The Contractor shall protect from damage all existing improvements and utilities at <br /> or near the work site and on adjacent property of a third party, the locations of <br /> which are made known to or should be known by the Contractor. The Contractor <br /> shall repair any damage to those facilities, including those that are the property of <br /> a third party, resulting from failure to comply with the requirements of this contract <br /> or failure to exercise reasonable care in performing the work. If the Contractor fails <br /> to repair the damage promptly, the Owner may have the necessary work <br /> performed and charge the cost to the Contractor. <br /> C. Temporary Enclosures <br /> Protect the Work from exposure, to weather, and construction activities. <br /> Coordinate enclosures with construction processes, prevent dangerous conditions <br /> and effects. Close openings through horizontal surfaces with substantial load- <br /> bearing construction. <br /> D. Traffic Surface Protection <br /> Provide as necessary and as directed to prevent damage to concrete, asphalt, and <br /> masonry pavements; walkways, drives and parking lots. Repair damaged surfaces <br /> at no expense to the Owner. <br /> 3.3 RESTORATION: Upon completion of contract, deliver work complete and undamaged. <br /> Existing work disturbed or removed as a result of performing required new work, shall be <br /> patched, repaired, reinstalled, or replaced with new work, and refinished and left in as <br /> 01 11 00 - 3 SUMMARY OF WORK <br />