Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 25 00 -4 <br /> Inductive Charging Infrastructure for Everett Transit <br /> concerning "substitutions"for the selection of a matching product in another <br /> product category. <br /> 7. VISUAL SELECTION: Where specified product requirements include the phrase <br /> "...as selected from the manufacturer's standard colors, patterns, textures..." or <br /> similar phrases, select a product and manufacturer that complies with other <br /> specified requirements.Architect will select the color, patterns and texture from the <br /> product line selected. <br /> 1.7 SUBSTITUTIONS <br /> I <br /> A. GENERAL: If the Contractor desires approval of some material or product other than that <br /> specified, he may submit a written request for approval of the substitute item in <br /> accordance with the following requirements. <br /> 1. All such requests shall be submitted in four (4) copies and must be made on the <br /> "Substitution Request Form", see Section 006325 Substitution Request Form. <br /> 2. No request for approval will be considered unless submitted in accordance with <br /> this Section. <br /> 3. Final decision as to whether an item is an equal or satisfactory substitution rests <br /> with the Owner. <br /> B. REQUESTS FOR APPROVAL: Every request for approval must state whether the item <br /> offered is an equal or better substitution. Each request for substitution must bereferenced <br /> to the related specification section and drawing numbers, and be complete with product <br /> data/drawings, description of methods, technical and other information. If applicable, <br /> include samples showing comparison or physical and other pertinent characteristics as <br /> required to establish equivalence of acceptability for the proposed application. Where <br /> specific a test results are required by the contract documents, the comparison data for <br /> the proposed item shall be based upon the same test methods as those specified, or <br /> they shall be correlated to clearly demonstrate comparability. The same warranty <br /> described for the specified product is required for the substitution. <br /> C. DURING BID PERIOD: Request for substitutions will not be considered during the bid <br /> period. <br /> D. AFTER RECEIPT OF BID: Requests for approval of alternative materials or products will <br /> be considered by the Owner for a period of sixty (60) calendar days following date of <br /> "Notice To Proceed". Within ten (10) calendar days of receipt of Contractor's request for <br /> substitution, the Owner will request whatever additional information or documentation <br /> may be needed for his evaluation of the request. Within twenty (20) calendar days of <br /> receipt of request, or within one week of receipt of requested additional information or <br /> documentation (whichever is later), the Owner will notify the Contractor of either his <br /> acceptance or his rejection of the proposed substitution. In submitting a request for <br /> substitution, the Contractor agrees to the following: <br /> 1. That the Contractor has personally investigated the proposed substitute product or <br /> material and determined that it is equal or superior in all respects to that specified. <br /> 2. That the Contractor shall provide the same warranty for the substitution as he <br /> would for that specified. <br /> 3. That the Contractor will coordinate all trades, including changes thereto as may be <br /> required,that he waives all claims for additional costs which subsequently become <br /> 01 25 00-4 SUBSTITUTION PROCEDURES <br />