Laserfiche WebLink
City of Everett 01 29 73 - 5 <br /> Inductive Charging Infrastructure for Everett Transit <br /> 5. Overhead and Profit. <br /> 6. Total Cost. <br /> B. Show total sum for each cost category as well as total cost for each work activity. <br /> PART 2 - PRODUCTS (Not Used) <br /> PART 3 - EXECUTION (Not Used) <br /> END OF SECTION 01 29 73 <br /> 01 29 73 - 5 SCHEDULE OF VALUES <br />