My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 30 00 -2 <br /> Inductive Charging Infrastructure for Everett Transit <br /> 1.3 SUBMITTAL DEFINITIONS <br /> A. Shop Drawings: Drawings, Product Data and Samples required by individual <br /> Specification sections for permanent incorporation in the work. <br /> B. Working Drawings: The Contractor's Plan for temporary equipment or structures <br /> such as decking, temporary bulkheads, support of excavation, support of utilities, <br /> ground water control, and forming and falsework; and, for such other work as <br /> may be required for construction but which does not become an integral part of <br /> the completed work. <br /> C. Samples: Samples of Materials or equipment submitted to the Construction <br /> Manager for approval prior to incorporating in the work, as required by <br /> Specification sections. <br /> D. Certification: Certificates or certified test results submitted by the Contractor <br /> which demonstrate proof of compliance with the Specifications for products, <br /> Materials, equipment, systems, and qualifications of personnel, manufacturers, <br /> fabricators, and installers. <br /> E. Documentation: Documents required to be submitted by the Specifications <br /> including test reports, calculations and miscellaneous items such as delivery <br /> tickets, batch tickets, and Bills of Material. <br /> F. Operations and Maintenance Manuals: Operations and maintenance manuals for <br /> equipment and systems as described in Section 01 73 23 of these Specifications. <br /> G. Record Documents: Documents as described in Section 01 78 39 Project <br /> Record Documents. <br /> H. Overstock Items: Those items identified in Special Provision 07, which are to be <br /> purchased as a part of this Contract by the Contractor and delivered to the <br /> Owner. <br /> 1.4 QUALITY ASSURANCE/CONTROL <br /> Shop Drawings and record documents shall be prepared to a high standard of quality, such as <br /> that set forth in DOD-STD-100, ANSI Y14 Series or other approved lower tier Specifications <br /> defining equal drafting. <br /> 1.5 CHANGES <br /> Changes in the Master-List of Submittals and the approved submittals shall not be permitted <br /> unless those changes have been accepted and approved, in writing, by the Construction <br /> Manager. <br /> 01 30 00 - 2 SUBMITTALS <br />
The URL can be used to link to this page
Your browser does not support the video tag.