Laserfiche WebLink
City of Everett 01 30 00 -2 <br /> Inductive Charging Infrastructure for Everett Transit <br /> 1.3 SUBMITTAL DEFINITIONS <br /> A. Shop Drawings: Drawings, Product Data and Samples required by individual <br /> Specification sections for permanent incorporation in the work. <br /> B. Working Drawings: The Contractor's Plan for temporary equipment or structures <br /> such as decking, temporary bulkheads, support of excavation, support of utilities, <br /> ground water control, and forming and falsework; and, for such other work as <br /> may be required for construction but which does not become an integral part of <br /> the completed work. <br /> C. Samples: Samples of Materials or equipment submitted to the Construction <br /> Manager for approval prior to incorporating in the work, as required by <br /> Specification sections. <br /> D. Certification: Certificates or certified test results submitted by the Contractor <br /> which demonstrate proof of compliance with the Specifications for products, <br /> Materials, equipment, systems, and qualifications of personnel, manufacturers, <br /> fabricators, and installers. <br /> E. Documentation: Documents required to be submitted by the Specifications <br /> including test reports, calculations and miscellaneous items such as delivery <br /> tickets, batch tickets, and Bills of Material. <br /> F. Operations and Maintenance Manuals: Operations and maintenance manuals for <br /> equipment and systems as described in Section 01 73 23 of these Specifications. <br /> G. Record Documents: Documents as described in Section 01 78 39 Project <br /> Record Documents. <br /> H. Overstock Items: Those items identified in Special Provision 07, which are to be <br /> purchased as a part of this Contract by the Contractor and delivered to the <br /> Owner. <br /> 1.4 QUALITY ASSURANCE/CONTROL <br /> Shop Drawings and record documents shall be prepared to a high standard of quality, such as <br /> that set forth in DOD-STD-100, ANSI Y14 Series or other approved lower tier Specifications <br /> defining equal drafting. <br /> 1.5 CHANGES <br /> Changes in the Master-List of Submittals and the approved submittals shall not be permitted <br /> unless those changes have been accepted and approved, in writing, by the Construction <br /> Manager. <br /> 01 30 00 - 2 SUBMITTALS <br />