My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 30 00 - 3 <br /> Inductive Charging Infrastructure for Everett Transit <br /> 1.6 DESIGN BUILD ELEMENTS <br /> A. The Contractor shall identify the submittals that are required by the Contract <br /> Documents, determine the date on which each submittal will be required in <br /> conformance with the project schedule and furnish a Master List of those <br /> Submittals to the Owner. The Master List shall identify all the submittals that are <br /> required, and the date on which each submittal will be required in conformance <br /> with the project schedule. The Owner will assist the Contractor in determining <br /> which submittals the Owner will review and which submittals the local <br /> jurisdiction(s)will review, which the Owner and the local jurisdictions only want <br /> copies of, and which are only to be kept on file by the Contractor, and the date on <br /> which each submittal will be required in conformance with the Contract <br /> B. It is anticipated submittals for items listed herein shall be transmitted to the <br /> appropriate local jurisdictions for their approval. <br /> C. The Contractor shall submit, to the appropriate local jurisdictions, the required <br /> number of sets of Engineer reviewed Shop Drawings and calculations for plan <br /> examination and permit. All design submittals to the appropriate local <br /> jurisdictions shall be stamped by an Engineer registered in Washington. A copy <br /> of all submittals approved by the appropriate local jurisdictions shall be submitted <br /> to the Construction Manager prior to the start of Work. <br /> D. Such submittals shall include a clearly detailed sectional drawing of each system, <br /> identifying all components and their method of attachment to supporting <br /> structure, and adjacent Contractor designed work, if applicable; and be one <br /> single submittal which includes all components and products of each building <br /> system. <br /> PART 2 - PRODUCTS <br /> 2.1 MASTER LIST OF SUBMITTALS: <br /> A. The Master List shall be submitted 30 days prior to the Notice to Proceed for <br /> Construction. Submittals requiring Owner or local jurisdiction reviews shall have <br /> dates which allow for not less than 30 Day cycles for review and acceptance by <br /> the Construction Manager. Any work performed prior to the required submittals <br /> being approved is at the Contractor's risk. <br /> B. Form: Prepare Submittal Master-List. Indicate following: <br /> 1. Category of submittal. <br /> 2. Generic description of Work covered. <br /> 3. Identify primary and other required reviewers <br /> 4. Target submittal dates. <br /> 01 30 00 - 3 SUBMITTALS <br />
The URL can be used to link to this page
Your browser does not support the video tag.