Laserfiche WebLink
City of Everett 01 30 00 - 10 <br /> Inductive Charging Infrastructure for Everett Transit <br /> samples required by individual Specification Sections and notations of <br /> coordination requirements with other work. <br /> C. Submittal of the Working drawings shall include verification of and provide <br /> special notation of dimensions established by field measurements. <br /> D. Working Drawings and associated calculations, if required, shall be prepared, <br /> stamped and signed by an Engineer of the involved discipline, currently <br /> registered as a Professional Engineer in the State of Washington. Identify <br /> calculations by reference to the working drawing to which the calculations <br /> pertain. <br /> E. The Contractor shall not begin work for which working drawings and associated <br /> calculations are required until the drawings and calculations have been reviewed <br /> by the Construction Manager; and the Construction Manager's exceptions, if any, <br /> have been addressed; and, submittals have been returned to the Contractor with <br /> the required approval stamps and signatures. <br /> 3.7 SAMPLES <br /> A. Provide office samples of sizes and quantities to clearly illustrate full range of <br /> manufacturers' standard colors, textures, patterns, functional and aesthetic <br /> characteristics of products and materials, including integral parts and attachment <br /> devices. <br /> B. Erect field samples and mock-ups at the work site as specified in the individual <br /> Specification sections and as may be necessitated by the Contractor submitting <br /> value engineering proposals, and at locations acceptable to the Construction <br /> Manager. <br /> C. Sample submittals shall include identification on each sample, with full Project <br /> information as required herein and in the individual Specification sections. <br /> D. Furnish required samples at no additional cost to the Owner. <br /> 3.8 OVERSTOCK ITEMS <br /> The Contractor shall coordinate with the Construction Manager to develop the list of overstock <br /> items. <br /> END OF SECTION 01 30 00 <br /> 01 30 00 - 10 SUBMITTALS <br />