My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 30 00 - 10 <br /> Inductive Charging Infrastructure for Everett Transit <br /> samples required by individual Specification Sections and notations of <br /> coordination requirements with other work. <br /> C. Submittal of the Working drawings shall include verification of and provide <br /> special notation of dimensions established by field measurements. <br /> D. Working Drawings and associated calculations, if required, shall be prepared, <br /> stamped and signed by an Engineer of the involved discipline, currently <br /> registered as a Professional Engineer in the State of Washington. Identify <br /> calculations by reference to the working drawing to which the calculations <br /> pertain. <br /> E. The Contractor shall not begin work for which working drawings and associated <br /> calculations are required until the drawings and calculations have been reviewed <br /> by the Construction Manager; and the Construction Manager's exceptions, if any, <br /> have been addressed; and, submittals have been returned to the Contractor with <br /> the required approval stamps and signatures. <br /> 3.7 SAMPLES <br /> A. Provide office samples of sizes and quantities to clearly illustrate full range of <br /> manufacturers' standard colors, textures, patterns, functional and aesthetic <br /> characteristics of products and materials, including integral parts and attachment <br /> devices. <br /> B. Erect field samples and mock-ups at the work site as specified in the individual <br /> Specification sections and as may be necessitated by the Contractor submitting <br /> value engineering proposals, and at locations acceptable to the Construction <br /> Manager. <br /> C. Sample submittals shall include identification on each sample, with full Project <br /> information as required herein and in the individual Specification sections. <br /> D. Furnish required samples at no additional cost to the Owner. <br /> 3.8 OVERSTOCK ITEMS <br /> The Contractor shall coordinate with the Construction Manager to develop the list of overstock <br /> items. <br /> END OF SECTION 01 30 00 <br /> 01 30 00 - 10 SUBMITTALS <br />
The URL can be used to link to this page
Your browser does not support the video tag.