My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 30 00 - 9 <br /> Inductive Charging Infrastructure for Everett Transit <br /> A. Modify manufacturers' standard catalog cuts, brochures, diagrams, schedules, <br /> performance charts, illustrations, calculations, drawings, printed installation, <br /> erection, application, placing instructions, and other descriptive data to delete <br /> information that is not applicable to the Contract. Supplement standard <br /> information with additional information indicating dimensions, clearances, <br /> performance characteristics, capacities, wiring and piping diagrams, controls, etc. <br /> applicable to this Contract. <br /> B. Submit (and as necessary modify) manufacturers' printed instructions for <br /> delivery, storage, assembly, installation, placing, start-up, adjusting, and finishing <br /> to delete information that is not applicable to the Contract. <br /> C. Certificates of compliance shall be submitted for those products for which no <br /> samples and test results are specified. Copy of certificate shall also accompany <br /> the product for which the certificate is prepared. The certificates shall: <br /> 1. State that the product complies with the respective Specification and Plan <br /> requirements. <br /> 2. Be accompanied by a certified copy of test results pertaining to the <br /> product. <br /> 3. Show the submittal date, Contractor's name and address, Contract title <br /> and number, product represented and its location in the Contract, <br /> manufacturer's name, product trade and catalog number, place of product <br /> origin, test date, testing organization's name and address, quantity of the <br /> product to be furnished, and related Drawing and Specification section <br /> number. <br /> 4. Be signed by an officer or other authorized representative of the <br /> manufacturer and be notarized. <br /> 5. Be received by the Construction Manager not later than 30 days before <br /> the products are to be installed. <br /> 3.6 WORKING DRAWINGS <br /> A. Submit Working Drawings and associated calculations for temporary Work that <br /> will not become a part of the permanent structures included in this Contract. Use <br /> a working drawing sheet with a maximum size of 22 inches by 34 inches. Identify <br /> working drawings by a control number and by reference to Plan numbers and/or <br /> Specification Section numbers, as applicable. Working drawings shall show <br /> information as required herein and in the individual Specification sections. <br /> B. Submittal of the Working drawings shall include, associated calculations, <br /> dimensions, identification of specific products and materials, product data and <br /> 01 30 00 - 9 SUBMITTALS <br />
The URL can be used to link to this page
Your browser does not support the video tag.