My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 32 16 - 1 <br /> Inductive Charging Infrastructure for Everett Transit <br /> SECTION 01 32 16-CONSTRUCTION PROGRESS SCHEDULE <br /> PART I -GENERAL <br /> 1.1 CONSTRUCTION SCHEDULE <br /> A. The Contractor shall prepare a construction schedule showing all tasks required to <br /> perform the work. Schedule shall show all tasks performed by all trades that is required <br /> to perform work within the contract time. The Schedule shall include sufficient time for <br /> cleaning, punch list review and completion of punch list items prior to the designated <br /> physical completion date. <br /> 1.2 FORMAT <br /> A. The Schedule shall be a critical path method Gantt chart style, preferably Microsoft <br /> Project. <br /> B. The Schedule shall clearly identify all work and detailed to show specific steps to perform <br /> work. The relationship between the work items shall show the starting date, length of <br /> time required to perform work, completion of the work within the time frame shown. <br /> C. All work found on the schedule of values shall be clearly identified. Unless otherwise <br /> expressly authorized in writing by the Owner's representative, the Contractor must <br /> integrate the schedules with the Schedule of Values and unit price items so that each <br /> construction activity is represented by a dollar value. <br /> D. Submittals dates shall be included and the relationship between submittal and the work <br /> item shall be identified <br /> E. Materials requiring long lead times shall be clearly identified on the schedule. This shall <br /> include: <br /> 1. Date materials musts be ordered <br /> 2. Time for manufacturing <br /> 3. Time for delivery <br /> 4. Delivery date (expected date materials to be at the project) <br /> 5. Date of Installation <br /> 1.3 SUBMITTAL <br /> A. At the pre-construction meeting, a preliminary schedule is required to be submitted. Once <br /> the preliminary schedule has been approved, the schedule shall become the Project <br /> Schedule. The Project Schedule, as approved by the Owner, will be an integralpart of <br /> the contract and will establish interim completion dates for the various activities under <br /> the contract. <br /> 01 32 16 - 1 CONSTRUCTION PROGRESS SCHEDULE <br />
The URL can be used to link to this page
Your browser does not support the video tag.