My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 32 16 - 2 <br /> Inductive Charging Infrastructure for Everett Transit <br /> B. Schedule shall be submitted electronic. Acceptable format .mmp or as otherwise <br /> approved by Owner. <br /> C. Review by the Owner or Owner's Representative shall not constitute approval or <br /> acceptance of the Contractor's construction means, methods, sequencing, logic, order, <br /> precedence and succession of activities or Contractor's ability to complete the Work in a <br /> timely manner. <br /> D. The review/approval of any schedule shall not transfer any of the Contractor's <br /> responsibilities to the Owner. <br /> E. Subcontractors shall review all schedules prior to submittal. At the Owner's option and <br /> sole discretion, Owner may require Contractor to obtain written acceptance of each <br /> schedule by subcontractors as practical and feasible, as the schedule relates to <br /> subcontractors' work. <br /> 1.4 UPDATES <br /> A. The Project Construction Schedule will be reviewed and updated at each progress <br /> meeting. All changes to the project schedule of more than three (3) working days shall <br /> be documented. The Schedule shall be updated to show measures required to bring <br /> project back on schedule. The Contractor alone shall remain responsible for adjusting <br /> forces, equipment, and work schedules to ensure completion of the work within the <br /> Contract Time. Any mistakes or errors in any schedule, including, but not limited to, <br /> mistakes or errors of logic, order, precedence, and duration, are and remain the <br /> Contractor's. <br /> B. Should any activity not be completed by the stated scheduled date, the Owner will have <br /> the right to require the Contractor to expedite completion of the activity by whatever <br /> means appropriate and necessary, without additional compensation to the Contractor. <br /> C. The Schedule shall be used to justify time extension days requested by the Contractor. <br /> For additional days requested, the Schedule shall be detailed enough to identify the work <br /> item(s) affected and the relationship to the changed or added work. <br /> D. Schedule shall be provided during the construction meetings. Schedule shall be on <br /> 11x17 paper or as otherwise approved by Owner and shall show current work progress. <br /> 1.5 OWNER PROVIDED MATERIALS <br /> A. All items to be provided by the Owner shall be incorporated into the schedule. The <br /> schedule shall show when the materials are required to be delivered to the project and <br /> when the materials will be installed. These materials are to be included in the preliminary <br /> schedule, upon review; owner will confirm lead time for materials and delivery dates. <br /> B. Contractor failure to include owner provided materials into the schedule shall be <br /> responsible for all delays to the work or failure to notify the owner of tasks dependent <br /> upon the owner furnished materials shall constitute a waiver by the contractor of any <br /> 01 32 16 -2 CONSTRUCTION PROGRESS SCHEDULE <br />
The URL can be used to link to this page
Your browser does not support the video tag.