My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 42 00 -4 <br /> Inductive Charqinq Infrastructure for Everett Transit <br /> CONC. CONCRETE <br /> COND. CONDITION <br /> CONN. CONNECTION <br /> CONT. CONTINUOUS <br /> C.P. CONCRETE PIPE <br /> C.P.P. CORRUGATED-PERFORATED PIPE <br /> CTRS. CENTERS <br /> C.W. CONCRETE WALK <br /> C.Y. CUBIC YARD <br /> D.F. DOUGLAS FIR <br /> DET. DETAIL <br /> DIA. DIAMETER <br /> DIM. DIMENSION <br /> D.L. DAYLIGHT GRADE <br /> E. EAST <br /> EA. EACH <br /> E.J. EXPANSION JOINT <br /> ELEC. ELECTRICAL <br /> EL.or ELEV. ELEVATION <br /> ENG. ENGINEER <br /> E.P. EDGE OF PAVING <br /> E/Q. EQUAL <br /> E.W. EACH WAY <br /> EX. EXISTING <br /> EXIST. EXISTING <br /> F.E. FINISHED ELEVATION <br /> F.G. FINISH GRADE <br /> F.H. FIRE HYDRANT <br /> FIN. FINISH <br /> F.L. FLOW LINE <br /> FLD. FIELD <br /> F.S. FINISH SURFACE <br /> FTG. FOOTING <br /> GA. GAUGE <br /> GAL. GALLON <br /> GALV. GALVANIZED <br /> G.C. GROUND COVER <br /> G.E. GRATE ELEVATION <br /> G.I. GALVANIZED IRON <br /> H.B. HOSE BIBB <br /> HDPE HIGH DENSITY POLYETHYLENE <br /> HDR. HEADERBOARD or HEADER <br /> H.H. HAND HOLE <br /> HT. HEIGHT <br /> I.D. INSIDE DIAMETER <br /> I.E. INVERT ELEVATION <br /> INV. INVERT <br /> J.B. JUNCTION BOX <br /> JTS JOINTS <br /> L.A. LANDSCAPE ARCHITECT <br /> L.C. LENGTH OF CURVE <br /> 01 42 00 -4 REFERENCES <br />
The URL can be used to link to this page
Your browser does not support the video tag.