My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 42 00 - 5 <br /> Inductive Charging Infrastructure for Everett Transit <br /> L.F. LINEAR FEET <br /> L.P. LOW POINT <br /> M.H. MAN HOLE <br /> MAX. MAXIMUM <br /> MIN. MINIMUM <br /> N. NORTH <br /> N.I.C. NOT IN CONTRACT <br /> O.C. ON CENTER <br /> O.D. OUTSIDE DIAMETER <br /> PAV. PAVING <br /> P.E. POLYETHYLENE <br /> PED. PEDESTRIAN <br /> PERIM. PERIMETER <br /> P.S.I. POUNDS PER SQUARE INCH <br /> PTD. PAINTED <br /> P.V.C. POLYVINYLCHLORIDE <br /> Q.C.V. QUICK COUPLING VALVE <br /> R. RADIUS <br /> R.E. RIM ELEVATION <br /> REQ. REQUIRED <br /> REQ'D. REQUIRED <br /> REG. REGULAR <br /> REM. REMOVE <br /> REQD. REQUIRED <br /> R/W RIGHT OF WAY <br /> S. SOUTH <br /> S.D. STORM DRAIN <br /> SDR. STANDARD DIMENSION RATIO <br /> SECT. SECTION <br /> S.F. SQUARE FEET <br /> S.G. SUB GRADE <br /> SHT. SHEET <br /> SIM. SIMILAR <br /> SPEC. SPECIFICATIONS <br /> SQ. SQUARE <br /> S.S. SANITARY SEWER <br /> STD. STANDARD <br /> STL. STEEL <br /> T.B. TOP OF BERM <br /> T.C. TOP OF CURB <br /> TEC. TEMPORARY EROSION CONTROL <br /> T.P. TOP OF PAVING <br /> T.S. TOP OF STEPS <br /> T.W. TOP OF WALL <br /> TYP. TYPICAL <br /> V. VALVE <br /> VERT. VERTICAL <br /> W. WIDE/WIDTH <br /> W/O WITHOUT <br /> W/ WITH <br /> W.M. WATER METER <br /> 01 42 00 - 5 REFERENCES <br />
The URL can be used to link to this page
Your browser does not support the video tag.