My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 45 00- 5 <br /> Inductive Charging Infrastructure for Everett Transit <br /> 2. Incidental labor and facilities necessary to facilitate tests and inspections. <br /> 3. Adequate quantities of representative samples of materials that require testing and <br /> inspecting. Assist agency in obtaining samples. <br /> 4. Facilities for storage and field-curing of test samples. <br /> 5. Delivery of samples to testing agencies. <br /> 6. Preliminary design mix proposed for use for material mixes that require control by <br /> testing agency. <br /> 7. Security and protection for samples and for testing and inspecting equipment at <br /> Project site. <br /> H. Coordination: Coordinate sequence of activities to accommodate required quality- <br /> assurance and quality-control services with a minimum of delay and to avoid necessity <br /> of removing and replacing construction to accommodate testing and inspecting. <br /> 1. Schedule times for tests, inspections, obtaining samples, and similar activities. <br /> PART 2 - PRODUCTS (Not Used) <br /> PART 3 -EXECUTION <br /> 3.1 REPAIR AND PROTECTION <br /> A. General: On completion of testing, inspecting, sample taking, and similar services, repair <br /> damaged construction and restore substrates and finishes. <br /> 1. Provide materials and comply with installation requirements specified in other <br /> Sections of these Specifications. Restore patched areas and extend restoration <br /> into adjoining areas in a manner that eliminates evidence of patching. <br /> B. Protect construction exposed by or for quality-control service activities. <br /> C. Repair and protection are Contractor's responsibility, regardless of the assignment of <br /> responsibility for quality-control services. <br /> END OF SECTION 01 45 00 <br /> 01 45 00 - 5 QUALITY CONTROL <br />
The URL can be used to link to this page
Your browser does not support the video tag.