My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 45 23- 1 <br /> Inductive Charging Infrastructure for Everett Transit <br /> SECTION 01 45 23 -TESTING AND INSPECTION SERVICES <br /> PART 1 -GENERAL <br /> 1.1 SUMMARY <br /> A. Section Includes: <br /> 1. Special structural inspections required by Code. <br /> 2. Geotechnical evaluation and inspection services. <br /> 3. Field quality control testing and inspections, including, but not limited to Water <br /> penetration resistance and air leakage field testing. <br /> B. Related Sections: <br /> 1. Section 31 20 00 - Earthwork <br /> 2. Section 03 11 00 - Concrete Formwork <br /> 3. Section 03 21 00 - Reinforcing Steel <br /> 4. Section 03 30 00 - Cast-in-Place Concrete <br /> 5. Section 04 26 13 - Masonry Veneer <br /> 6. Section 05 12 00 - Structural Steel <br /> 7. Division 22 - Plumbing <br /> 8. Division 23 - Heating, Ventilating, and Air Conditioning <br /> 9. Division 26 - Electrical <br /> 1.2 REFERENCES <br /> A. Reference Standards: Current edition at date of Bid. <br /> B. American Concrete Institute (ACI): <br /> 1. ACI 214 - Recommended Practice for Evaluation of Strength Test Results of <br /> Concrete. <br /> 2. ACI 318 - Code Interpretation of Building Code Requirements for Reinforced <br /> Concrete. <br /> C. ASTM International: <br /> 1. ASTM C31 - Practices for Making and Curing Concrete Test Specimens in <br /> the Field. <br /> 2. ASTM C33 - Standard Specifications for Concrete Aggregates. <br /> 3. ASTM C39 - Test Method for Compressive Strength of Cylindrical Concrete <br /> Specimens. <br /> 4. ASTM C42 - Method of Obtaining and Testing Drilled Cores and Sawed <br /> Beams of Concrete. <br /> 5. ASTM C143 - Test Method for Slump of Hydraulic Cement Concrete. <br /> 01 45 23 - 1 TESTING AND INSPECTION SERVICES <br />
The URL can be used to link to this page
Your browser does not support the video tag.