Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 45 23 - 8 <br /> Inductive Charging Infrastructure for Everett Transit <br /> specified.Where not accepted, Structural Engineer analysis and correction of work <br /> will be made at Contractor's expense. <br /> 4. Core Holes: Repair at Contractor's expense using accepted dry pack or specified <br /> non-shrink grout. <br /> I. Concrete Slump Tests: Make slump test for each batch delivered and at least 1 test each <br /> hour during continuous placements. Verify that batches are consistent. Test each batch <br /> to ASTM C143. <br /> J. Air Content: Test each set of concrete compression test cylinders to ASTM C231 at <br /> minimum one test each day. <br /> K. Concrete Curing Procedures: Conduct inspections and verify compliance with specified <br /> requirements. <br /> L. Anchors: Inspect epoxy anchors and expansion bolts installed in concrete as defined by <br /> IBC Chapter 17. <br /> 1.13 MASONRY CONSTRUCTION TESTS AND INSPECTIONS <br /> A. Structural Masonry: As specified by Division 04 Sections and as required by IBC Section <br /> 17 04.5. <br /> B. Inspect grout spaces and cleanouts, take prism and test samples, inspect after <br /> placement of reinforcing steel, and during grouting operations, except as otherwise <br /> permitted by Code. <br /> 1.14 OTHER MISCELLANEOUS TESTS AND INSPECTIONS <br /> A. Special Cases: As required by IBC, as determined by Building Code Official, and as <br /> requested by Architect <br /> PART 2 - PRODUCTS (Not Used) <br /> PART 3 -EXECUTION (Not Used) <br /> END OF SECTION 01 45 23 <br /> 01 45 23 - 8 TESTING AND INSPECTION SERVICES <br />