My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 50 00 - 1 <br /> Inductive Charging Infrastructure for Everett Transit <br /> SECTION 01 50 00 -TEMPORARY FACILITIES AND CONTROLS <br /> PART 1 -GENERAL <br /> 1.1 SECTION INCLUDES <br /> A. This work includes furnishing, installing, operating, maintaining, and removal of <br /> temporary construction facilities. <br /> 1.2 TEMPORARY FACILITIES <br /> A. Meals and Lodging: The Owner will not provide meal and lodging facilities for the <br /> Contractor's personnel. <br /> B. The Contractor shall make all necessary arrangements for temporary water service. All <br /> costs thereof shall be borne by the Contractor. <br /> C. Electric Power: The Contractor shall make all necessary arrangements for temporary <br /> electrical service. All costs thereof shall be borne by the Contractor. <br /> D. Toilet Facilities <br /> 1. The Contractor shall provide and maintain adequate chemical toilet facilities for all <br /> individuals connected with the work, with separate facilities for men and women. <br /> 2. The Contractor shall keep the toilet facilities in sanitary condition in accordance <br /> with the Snohomish County Health Department. <br /> 3. The Contractor shall remove the toilet facilities at completion of the contract and <br /> shall disinfect the premises. <br /> E. Telephone Service: The Contractor shall make arrangements for temporary telephone <br /> service. All costs thereof shall be borne by the Contractor. <br /> F. The Contractor shall maintain the construction area in a neat and orderly condition <br /> throughout the contract. Food and garbage shall be stored properly to prevent attracting <br /> animals. Remove food and garbage from the site during non-work hours. Practice <br /> controls to stop rodent infestation of temporary facilities and the job site. <br /> G. Staging and stockpiling areas will be determined in the pre-construction conference. <br /> H. Temporary Buildings: The Contractor may construct or provide temporary buildings, at <br /> an approved or designated location, as may be necessary for the performance of the <br /> work. At the completion of the work,the Contractor shall remove all temporary buildings. <br /> I. Hydrant Use Permits: The Contractor shall obtain required hydrant use permits from the <br /> Water Utility having control over fire hydrants. All costs thereof shall be borne by the <br /> Contractor. <br /> 01 50 00- 1 TEMPORARY FACILITIES AND CONTROLS <br />
The URL can be used to link to this page
Your browser does not support the video tag.