My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 55 00 - 10 <br /> Inductive Charging Infrastructure for Everett Transit <br /> be used by the flaggers while actually flagging traffic. The Contractor <br /> shall also provide any such equipment used that is necessary or <br /> desirable to protect personnel engaged in other activities. <br /> 2) The Contractor shall require all personnel at the work site under their <br /> control (including Subcontractors and lower tier Subcontractors) to <br /> comply with the following: <br /> a) To wear reflective vests, except that during daylight hours, <br /> orange clothing equivalent to "Ten Mile Cloth" or hunter orange <br /> may be worn in lieu of reflective vests <br /> b) To wear white coveralls at night <br /> c) Whenever rain gear is worn during hours of darkness, it shall be <br /> white or yellow. <br /> d) The reflective vests shall always be the outermost garment. <br /> 3) Reflective vests shall have a minimum of 100 square inches of <br /> reflective surface distributed 30 percent on the front and 70 percent on <br /> the back. The retro reflection value at an entrance angle of 4 degrees <br /> and an observation angle of 0.2 degrees shall be a minimum 500 <br /> candle power for the reflective surface of the vest. Reflective vests, <br /> hard hats, white coveralls, rain gear, and other apparel shall be <br /> furnished and maintained in a neat, clean, and presentable condition <br /> at no additional cost to the Owner. <br /> 2. Traffic Control Vehicles: <br /> a. The traffic control vehicle shall be equipped with a roof or post mount flashing <br /> amber light visible for 360 degrees. Truck and construction Equipment that <br /> encroaches onto the traveled Roadway for any reason shall also be <br /> equipped with flashing yellow warning lights. Unless one or more flagmen <br /> are present to control traffic, supplementary traffic control devices shall be <br /> placed to warn, slow down, and if necessary divert traffic around such <br /> Equipment. <br /> 3. Construction Signs: <br /> a. General <br /> 1) The Contractor shall furnish, install and maintain all traffic control signs <br /> required by the Contract or a Contractor's approved traffic control plan. <br /> These include: <br /> a) Temporary traffic control signs. <br /> b) Any permanent signs located in the construction area that are <br /> temporarily relocated, damaged or destroyed by the Contractor <br /> or a third party prior to the Physical Completion Date <br /> 2) When all or some of the necessary signs or traffic control devices are <br /> to be furnished by the Owner, it will be so specified in the Contract. <br /> 3) The Contractor shall: <br /> a) Provide the posts or supports <br /> b) Erect and maintain the signs in a clean, neat, and presentable <br /> condition until the Owner approves their removal <br /> c) Take these signs, posts, or supports down when the need for <br /> these signs has ceased.All posts and supports shall be removed <br /> from the Project and shall remain the property of the Contractor <br /> d) Remove all non-applicable signs, or completely cover with metal <br /> or plywood, during periods when they are not needed. <br /> 01 55 00- 10 VEHICULAR ACCESS AND PARKING <br />
The URL can be used to link to this page
Your browser does not support the video tag.