My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 7419 -4 <br /> Inductive Charging Infrastructure for Everett Transit <br /> C. Contractors Project Engineer: <br /> 1. Implement Waste Management Plan. <br /> 2. Distribute to subcontractors and other workers. <br /> 3. Oversee, instruct, and document results. <br /> 4. Review with Owner. <br /> D. Collect construction debris into clearly marked bins or containers, and arrange for <br /> transportation to recycling centers or adaptive salvage and reuse processing facilities. <br /> E. Maintain recycling and adaptive reuse storage and collection area in orderly <br /> arrangement with materials clearly separated to eliminate co-mingling of unsuitable <br /> materials. <br /> F. Do not store products in manner that may pollute, constitute a fire hazard, or otherwise <br /> constitute a hazard to persons or property. <br /> G. Cover to protect materials subject to disintegration, mixing with water runoff, or otherwise <br /> polluting air, water, and soil. <br /> 1.6 RECYCLING <br /> A. Use Source Separation Method or Co-mingling Method suitable to sorting and <br /> processing method of selected recycling center. Dispose non-recyclable trash separately <br /> into landfill. <br /> 1. Source Separation Method: Recyclable materials separated from trash and sorted <br /> into bins or containers prior to transportation to recycling center. <br /> 2. Co-Mingling Method: Recyclable materials separated from trash and placed in <br /> unsorted bins or container for sorting at recycling center. <br /> B. Design Waste Management Plan to divert following waste categories from the landfills. <br /> 1. Acoustical ceiling tiles <br /> 2. Asphalt <br /> 3. Bricks (where not reusable) <br /> 4. Cardboard (from supplies and packaging) <br /> 5. Carpet and carpet pad <br /> 6. Concrete <br /> 7. Concrete unit masonry <br /> 8. Equipment oil. <br /> 9. Excavated soils <br /> 10. Fluorescent tubes and ballasts (if not recycled designate as hazardous waste) <br /> 11. Gypsum board (clean, unpainted <br /> 12. Land clearing and organic plant debris <br /> 13. Metals (from banding, stud trim, ductwork, piping, rebar, roofing, other trim, steel, <br /> iron, galvanized sheet steel, stainless steel, aluminum, copper, zinc, lead, brass, <br /> and bronze) <br /> 14. Native stone and granular fill. <br /> 15. Packing materials including paper, cardboard, foam plastic, and sheeting. <br /> 16. Paint <br /> 17. Plastic film (sheeting, shrink wrap, packaging) <br /> 01 74 19 -4 CONSTRUCTION WASTE MANAGEMENT <br /> AND DISPOSAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.