My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 74 23 - 1 <br /> Inductive Charging Infrastructure for Everett Transit <br /> SECTION 01 74 23 - FINAL CLEANING <br /> PART 1 -GENERAL <br /> 1.1 SUMMARY <br /> A. This section includes administrative and procedural requirements for final cleaning of the <br /> Work prior to Substantial Completion, including but not limited to: <br /> 1. Cleaning procedures <br /> 2. Inspection <br /> B. Do not use cleaning materials that may damage finished surfaces. <br /> C. Do not use cleaning materials hazardous to health or property. <br /> D. Use only cleaning materials and methods recommended by manufacturer of item or <br /> material to be cleaned. <br /> PART 2 - PRODUCTS <br /> 2.1 MATERIALS <br /> A. Cleaning Agents: <br /> 1. Compatible with surface being cleaned <br /> 2. New and Uncontaminated <br /> 3. For Manufactured Surfaces, Use material recommend by manufacturer. <br /> PART 3 - EXECUTION <br /> 3.1 FINAL CLEANING <br /> A. Cleaning: Employ experienced workers or professional cleaners for final cleaning. Clean <br /> each surface or unit to the condition expected in a typical commercial building/site <br /> cleaning and maintenance program. Comply with manufacturer's instructions. Final <br /> cleaning includes but is not limited to the following procedures: <br /> 1. Remove dust and dirt in corners. <br /> 2. Remove all evidence of defacement from all surfaces including graffiti. <br /> 3. Remove grease, mastic, adhesives, glazing compounds, dust, dirt, stains, <br /> fingerprints, non-permanent labels, and other foreign materials from interior and <br /> exterior surfaces exposed to view. <br /> a. Clean hard-surface finishes to dirt-free condition, free of dust, stains, films <br /> and similar noticeable distracting substances. <br /> b. Except as otherwise indicated, avoid disturbance of natural weathering of <br /> exterior surfaces. <br /> c. Restore reflective surfaces to original reflective conditions. <br /> 01 74 23 - 1 FINAL CLEANING <br />
The URL can be used to link to this page
Your browser does not support the video tag.