My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 74 23 -2 <br /> Inductive Charging Infrastructure for Everett Transit <br /> d. Replace chipped, scratched or broken glass and other damaged transparent <br /> materials. <br /> e. Remove excess lubrication and other substances from mechanical and <br /> electrical equipment. Clean plumbing fixtures to a sanitary condition. <br /> f. Clean light fixtures and lamps. <br /> 4. Remove debris and surface dust from limited-access spaces including trenches, <br /> equipment vaults, manholes, catch basins, and similar spaces. <br /> a. Clean project site (yard and grounds), including landscape development <br /> areas, of litter and foreign substances. Sweep paved areas to a broom-clean <br /> condition. Remove stains, petro-chemical spills and other foreign deposits. <br /> Rake grounds which are neither planted nor paved to a smooth, even- <br /> textured surface. <br /> b. Leave concrete floors broom-clean. <br /> B. Removal of Protection: Except as otherwise indicated or requested by the Owner, <br /> remove temporary protection devices and facilities installed to protect previously <br /> completed work during the remainder of the construction period. <br /> C. Extra Materials: Where excess materials of value remain after completion of associated <br /> work, these materials become the property of the Owner. If declined by the Owner, the <br /> Contractor shall dispose of these materials as directed by the Owner. <br /> D. Storm/Sewer: Employee a professional cleaning service to vacuumed and wash all new <br /> storm and/or sewer pipes, structures and other elements associated with storm sewer <br /> assemblies. No sediment or contaminates shall be washed downstream to storm sewer <br /> assemblies off-site. If it comes to the owners attention that sediment/contaminates have <br /> been washed downstream, the owner may require the contractor to perform additional <br /> cleaning of storm/sewer assemblies downstream. The cost of this work shall be borne <br /> by the contractor and in no way passed onto the owner. If, the contractor refuses to <br /> comply, the owner will have the downstream storm/sewer assemblies cleaned by its own <br /> forces or by contract. The cost of this work shall be passed to the contractor via a <br /> changed order and the costs deducted from the contract amount. <br /> 3.2 INSPECTION <br /> A. Prior to requesting inspection for certification of Substantial Completion, inspect exposed <br /> surfaces. Verify entire Work is clean. <br /> B. Prior to certifying Substantial Completion, the Owner will make a detailed inspection of <br /> buildings, amenities and site, and will prepare a check list of cleaning and debris removal <br /> remaining to be completed before certification of Substantial Completion. Complete <br /> items on the Owner's check list, so that entire Project is clean and ready for occupancy <br /> by staff and public. <br /> END OF SECTION 01 74 23 <br /> 01 74 23 - 2 FINAL CLEANING <br />
The URL can be used to link to this page
Your browser does not support the video tag.