My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 26 00 10 - 14 <br /> Inductive Charging Infrastructure for Everett Transit <br /> a. On-site power-limited testing supervisor must have BICSI Registered <br /> Communications Distribution Designer certification and documented <br /> training and experience with testing power-limited equipment in accordance <br /> with NETA testing standards. <br /> 16. Structural Testing and Inspecting Agency: Entity possessing active qualifications <br /> specified in Section 014000 "Quality Requirements" with documented training <br /> and experience with testing structural concrete, seismic controls, and wind-load <br /> controls. <br /> 17. Outdoor Pole Testing and Inspecting Agency: Entity possessing active <br /> qualifications specified in Section 014000 "Quality Requirements" with <br /> documented training and experience in accordance with ASTM C1093 for <br /> foundation testing and inspections. <br /> 18. Luminaire Photometric Testing Laboratory: Entity possessing active qualifications <br /> specified in Section 014000 "Quality Requirements" accredited under the NVLAP <br /> for Energy Efficient Lighting Products, and complying with applicable IES testing <br /> standards. <br /> 19. Lighting Testing and Inspecting Agency: Entity possessing active qualifications <br /> specified in Section 014000 "Quality Requirements" with documented training <br /> and experience with testing and inspecting lighting installations in accordance <br /> with IES LM-5. <br /> B. Certifications: <br /> 1. Seismic-Load Performance Certificates: Provide special certification for <br /> designated seismic systems as indicated in Paragraph 13.2.2 "Special <br /> Certification Requirements for Designated Seismic Systems" of for all designated <br /> seismic-load systems identified on Drawings or in the Specifications. <br /> a. Include the following information: <br /> 1) Basis for Certification: Indicate whether withstand certification is <br /> based on actual test of assembled components or on calculation. <br /> 2) Dimensioned Outline Drawings of Equipment Unit: Identify center of <br /> gravity and locate and describe mounting and anchorage provisions. <br /> 3) Detailed description of equipment anchorage devices on which the <br /> certification is based and their installation requirements. <br /> 4) Detailed description of conduit support devices and interconnections <br /> on which the certification is based and their installation requirements. <br /> 5) Provide equipment manufacturer's written certification for each <br /> designated active electrical seismic device and system, stating that it <br /> will remain operable following the design earthquake. <br /> 6) Submit evidence demonstrating compliance with these requirements <br /> for approval to authorities having jurisdiction after review and <br /> acceptance by qualified structural professional engineer. <br /> b. The following systems and components are Designated Seismic Systems <br /> and require written special certification of seismic qualification by <br /> manufacturer: <br /> 1) Equipment, accessories, and components specified in <br /> Section 111136 "Vehicle Charging Equipment." <br /> 26 00 10 - 14 SUPPLEMENTAL REQUIREMENTS FOR ELECTRICAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.