My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 26 00 10 - 17 <br /> Inductive Charging Infrastructure for Everett Transit <br /> and operable following the design wind event and comply with <br /> requirements of authorities having jurisdiction. <br /> 2) Certification must be based on ICC-ES or similar nationally <br /> recognized testing standard procedures acceptable to authorities <br /> having jurisdiction. <br /> b. The following systems and components require written special certification <br /> of resistance to effects of high wind-load and impact damage by <br /> manufacturer: <br /> PART 2 - PRODUCTS <br /> 2.1 SUBSTITUTION LIMITATIONS FOR ELECTRICAL EQUIPMENT <br /> A. Substitution requests for electrical equipment will be entertained under the following <br /> conditions: <br /> 1. Notification of Contractor's intent to request substitutions for convenience must <br /> be declared during the Electrical Preconstruction Conference so potential risks to <br /> system performance and construction schedule may be identified for Contractor's <br /> response in submission of the substitution request. Submission of requests for <br /> substitutions for convenience must meet the conditions and deadline specified in <br /> Section 012500 "Substitution Procedures" to receive approval. <br /> 2. For electrical equipment and systems, substitutions for cause are considered <br /> major construction risks. If it is possible that Contractor may need to request <br /> substitutions for cause because of equipment unavailability, or inability to meet <br /> construction schedule because of lead time, Contractor must declare the <br /> possibility during the Electrical Preconstruction Conference to permit establishing <br /> a mitigation plan for minimizing risks to system performance and construction <br /> schedule. <br /> PART 3 - EXECUTION <br /> 3.1 PREPARATION <br /> A. Electrical Installation Schedule: At preconstruction meeting, and periodically thereafter <br /> as dates change, provide schedule for electrical installation Work to Owner and <br /> Architect including, but not limited to, milestone dates for the following activities: <br /> 1. Submission of power system studies. <br /> 2. Submission of specified coordination drawings. <br /> 3. Submission of action submittals specified in Division 26. <br /> 4. Orders placed for major electrical equipment. <br /> 5. Arrival of major electrical equipment on-site. <br /> 6. Preinstallation meetings specified in Division 26. <br /> 7. Utility service outages. <br /> 8. Utility service inspection and activation. <br /> 9. Mockup reviews. <br /> 10. Closing of walls and ceilings containing electrical Work. <br /> 26 00 10 - 17 SUPPLEMENTAL REQUIREMENTS FOR ELECTRICAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.