Laserfiche WebLink
City of Everett 26 00 10 - 18 <br /> Inductive Charging Infrastructure for Everett Transit <br /> 11. System startup, testing, and commissioning activities for major electrical <br /> equipment. <br /> 12. System startup, testing, and commissioning activities for emergency lighting. <br /> 13. System startup, testing, and commissioning activities for automation systems <br /> (SCADA, BMS, lighting, HVAC, fire alarm, fire pump, etc.). <br /> 14. Pouring of concrete housekeeping pads for electrical equipment and testing of <br /> concrete samples. <br /> 15. Requests for special inspections. <br /> 16. Requests for inspections by authorities having jurisdiction. <br /> B. Coordination Drawings for Structural Supports: Show coordination of structural <br /> supports for equipment and devices, including restraints and bracing for control of <br /> seismic and wind loads, with other systems, equipment, and structural supports in the <br /> vicinity. <br /> C. Coordination Drawings for Ceiling Areas: Where indicated on Drawings, provide <br /> reflected ceiling plan(s), supplemented by sections and other details, drawn to scale, in <br /> accordance with Section 013100 "Project Management and Coordination," on which <br /> the following items are shown and coordinated with each other, using input from <br /> installers of the items involved: <br /> 1. Suspended ceiling components. <br /> 2. Structural members to which equipment, luminaires, and suspension systems will <br /> be attached. <br /> 3. Size and location of access panels on ceilings. <br /> 4. Elevation, size, and route of sprinkler piping. <br /> 5. Elevation, size, and route of plumbing piping. <br /> 6. Elevation, size, and route of ductwork. <br /> 7. Elevation, size, and route of cable tray. <br /> 8. Elevation, size, and route of conduit. <br /> 9. Elevation and size of wall-mounted and ceiling-mounted equipment. <br /> 10. Moldings. <br /> 11. Access panels. <br /> 12. Sprinklers. <br /> 13. Air inlets and outlets. <br /> 14. Control modules. <br /> 15. Luminaires. <br /> 16. Communications devices. <br /> 17. Speakers. <br /> 18. Ceiling-mounted projectors. <br /> 19. Security devices. <br /> 20. Fire-alarm devices. <br /> 21. Indicate clear dimensions for maintenance access in front of equipment. <br /> 22. Indicate dimensions of fully-open access doors. <br /> D. Coordination Drawings for Cable Tray Routing: Reflected ceiling plan(s), supplemented <br /> by sections and other details, drawn to scale, in accordance with Section 013100 <br /> "Project Management and Coordination," on which the following items are shown and <br /> coordinated with each other, using input from installers of the items involved: <br /> 1. Elevation, size, and route of cable trays. <br /> 2. Relationships between components and adjacent structural, electrical, and <br /> mechanical elements. <br /> 26 00 10 - 18 SUPPLEMENTAL REQUIREMENTS FOR ELECTRICAL <br />