My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 26 00 10 -20 <br /> Inductive Charging Infrastructure for Everett Transit <br /> a. Dimensioned concrete bases, outlines of equipment, conduit entries, and <br /> grounding equipment locations. <br /> b. If freight elevator must be used, indicate width and height of door and <br /> depth of car. Indicate if large equipment must be tipped to use elevator. <br /> c. Dimensioned working clearances and dedicated areas below and around <br /> electrical equipment where obstructions and tripping hazards are <br /> prohibited. <br /> 3. Reflected ceiling plans for entry floor and floor where equipment is located, <br /> drawn to scale, on which the following items shown and coordinated with each <br /> other, based on input from installers of the items involved: <br /> a. Support locations, type of support, and weight on each support. Locate <br /> structural supports for structure-supported raceways. <br /> b. Location of lighting fixtures, sprinkler piping and sprinklers, ducts and <br /> diffusers, and other obstructions, indicating available overhead clearance. <br /> c. Dimensioned working clearances and dedicated areas above and around <br /> electrical equipment where foreign systems and equipment are prohibited. <br /> H. Coordination Drawings for Large Equipment Outdoor Installations: <br /> 1. Utilities site plan, drawn to scale, showing heavy equipment or truck access <br /> paths for maintenance and replacement, with the following items shown and <br /> coordinated with each other, based on input from installers of the items involved: <br /> a. Fences and walls, dimensioned concrete bases, outlines of equipment, <br /> conduit entries, and grounding and bonding locations. <br /> b. Indicate clear dimensions for fence gates and wall openings. <br /> c. Indicate depth and type of ground cover, and locations of trees, shrubbery, <br /> and other obstructions in access path. <br /> d. Indicate clear height below tree branches, overhead lines, bridges, and <br /> other overhead obstructions in access path, or where cranes and hoists will <br /> be needed to handle large electrical equipment. <br /> e. Support locations, type of support, and weight on each support. Locate <br /> structural supports for structure-supported raceways. <br /> f. Dimensioned working clearances and dedicated areas around electrical <br /> equipment. <br /> Coordination Drawings for Duct Banks: <br /> 1. Show duct profiles and coordination with other utilities and underground <br /> structures. <br /> 2. Include plans and sections, drawn to scale, and show bends and locations of <br /> expansion fittings. <br /> 3.2 DELEGATED DESIGN OF STRUCTURAL PENETRATIONS <br /> A. Engage qualified structural professional engineer to design penetrations of structural <br /> masonry walls. <br /> B. Delegated Design Drawings for Structural Masonry Wall Penetrations: Where indicated <br /> on Drawings, provide reflected ceiling plan(s), supplemented by elevations, sections, <br /> and other details, drawn to scale, signed and sealed by a qualified structural <br /> 26 00 10 -20 SUPPLEMENTAL REQUIREMENTS FOR ELECTRICAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.