My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 26 00 10 -21 <br /> Inductive Charginq Infrastructure for Everett Transit <br /> professional engineer, on which the following items are shown and coordinated with <br /> each other, using input from installers of the items involved: <br /> 1. Location and dimensions of structural members supporting wall. <br /> 2. Location and dimensions of columns near penetrations. <br /> 3. Location and dimension of headers and lintels. <br /> 4. Doors and windows near penetrations. <br /> 5. Location and dimensions of penetrating cuts. <br /> 6. Sprinkler piping and sleeves. <br /> 7. Plumbing piping and sleeves. <br /> 8. Ductwork and sleeves. <br /> 9. Cable tray and sleeves. <br /> 10. Conduit and sleeves. <br /> 11. Firestopping assemblies for rated penetrations. <br /> 12. Structural supports for piping, ductwork, and conduit on both sides of wall. <br /> 3.3 INSTALLATION OF ELECTRICAL WORK <br /> A. Unless more stringent requirements are specified in the Contract Documents or <br /> manufacturers' written instructions, comply with NFPA 70 and NECA NEIS 1 for <br /> installation of Work specified in Division 26. Consult Architect for resolution of <br /> conflicting requirements. <br /> 3.4 FIELD QUALITY CONTROL <br /> A. Administrant for Low-Voltage Electrical Tests and Inspections: <br /> 1. Contractor will engage qualified low-voltage electrical testing and inspecting <br /> agency to administer and perform tests and inspections. <br /> 2. Engage qualified low-voltage electrical testing and inspecting agency to <br /> administer and perform tests and inspections. <br /> 3. Engage factory-authorized service representative to administer and perform tests <br /> and inspections on components, assemblies, and equipment installations, <br /> including connections. <br /> 4. Administer and perform tests and inspections <br /> B. Administrant for Field Tests and Inspections of Lighting Installations: <br /> 1. Contractor will engage qualified lighting testing and inspecting agency to <br /> administer and perform tests and inspections. <br /> 2. Engage qualified lighting testing and inspecting agency to administer and <br /> perform tests and inspections. <br /> 3. Engage factory-authorized service representative to administer and perform tests <br /> and inspections on components, assemblies, and equipment installations, <br /> including connections. <br /> 4. Administer and perform tests and inspections. <br /> C. Operation and Maintenance Data: Prepare and submit the following: <br /> 1. Provide emergency operation, normal operation, and preventive maintenance <br /> manuals for each system, equipment, and device listed below: <br /> 26 00 10 - 21 SUPPLEMENTAL REQUIREMENTS FOR ELECTRICAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.