My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 26 05 26 - 1 <br /> Inductive Charging Infrastructure for Everett Transit <br /> SECTION 260526 -GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS <br /> PART 1 -GENERAL <br /> 1.1 SUMMARY <br /> A. Section Includes: <br /> 1. Grounding and bonding conductors. <br /> 2. Grounding and bonding clamps. <br /> 3. Grounding and bonding bushings. <br /> 4. Grounding and bonding hubs. <br /> 5. Grounding electrodes. <br /> 6. Grounding electrode enclosures. <br /> B. Related Requirements: <br /> 1. Section 260010 "Supplemental Requirements for Electrical" specifies additional <br /> abbreviations, definitions, submittals, qualifications, testing agencies, and other <br /> Project requirements applicable to Work specified in this Section. <br /> 1.2 ACTION SUBMITTALS <br /> A. Product Data: For each type of product. <br /> B. Shop Drawings: Plans showing dimensioned locations of grounding features described <br /> in "Field Quality Control for Grounding and Bonding of Electrical Power" Article, <br /> including the following: <br /> 1. Grounding electrode access enclosures. <br /> 2. Grounding electrodes. <br /> 3. Grounding arrangements and connections for separately derived systems. <br /> C. Field quality-control reports. <br /> 1.3 CLOSEOUT SUBMITTALS <br /> A. Operation and Maintenance Data: <br /> 1. In addition to items specified in Section 260010 "Supplemental Requirements for <br /> Electrical," include the following: <br /> a. Plans showing locations of grounding features described in "Field Quality <br /> Control for Grounding and Bonding of Electrical Power" Article, including <br /> the following: <br /> 1) Grounding electrode access enclosures. <br /> 2) Grounding electrodes. <br /> 3) Grounding arrangements and connections for separately derived <br /> systems. <br /> 26 05 26 - 1 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.