My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 26 05 43 -4 <br /> Inductive Charging Infrastructure for Everett Transit <br /> 2.4 DUCT ACCESSORIES <br /> A. Duct Spacers: Factory-fabricated, rigid, PVC interlocking spacers; sized for type and <br /> size of duct with which used, and selected to provide minimum duct spacing indicated <br /> while supporting duct during concreting or backfilling. <br /> 2.5 HANDHOLES AND BOXES FOR EXTERIOR UNDERGROUND WIRING <br /> A. Performance Criteria: <br /> 1. Regulatory Requirements: Listed and labeled in accordance with NFPA 70 and <br /> marked for intended location and use. <br /> 2. General Characteristics: <br /> a. ASTM C858 for design and manufacturing processes. <br /> b. SCTE 77. <br /> 2.6 DUCT SEALING <br /> A. Duct-Sealing Compound: Nonhardening, safe for contact with human skin, not <br /> deleterious to cable insulation, and workable at temperatures as low as 35 deg F. <br /> Compound must be capable of withstanding temperature of 300 deg F without slump <br /> and adhering to clean surfaces of plastic ducts, metallic conduit, conduit and duct <br /> coatings, concrete, masonry, lead, cable sheaths, cable jackets, insulation materials, <br /> and common metals. Duct sealing compound must be removable without damaging <br /> ducts or cables. <br /> B. Inflatable Duct-Sealing System: Wraparound inflatable bladder that seals ducts that are <br /> empty or containing conductors against air and water infiltration. System is suitable for <br /> use in steel, plastic, or concrete ducts and penetrations. <br /> PART 3 - EXECUTION <br /> 3.1 PREPARATION <br /> A. Coordinate layout and installation of duct, duct bank, manholes, handholes, and boxes <br /> with final arrangement of other utilities, site grading, and surface features as <br /> determined in field. Notify Architect if there is conflict between areas of excavation and <br /> existing structures or archaeological sites to remain. <br /> B. Coordinate elevations of duct and duct-bank entrances into manholes, handholes, and <br /> boxes with final locations and profiles of duct and duct banks, as determined by <br /> coordination with other utilities, underground obstructions, and surface features. Revise <br /> locations and elevations as required to suit field conditions and to ensure that duct and <br /> duct bank will drain to manholes and handholes, and as approved by Architect. <br /> C. Bored Underground Duct: [EPEC-40] [EPEC-80] unless otherwise indicated. <br /> Coordinate first two paragraphs below with Drawings; consider indicating duct-bank <br /> reinforcement and backfill and pavement patching requirements on Drawings. <br /> 26 05 43 -4 UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL SYSTEMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.