My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 26 05 43 - 5 <br /> Inductive Charging Infrastructure for Everett Transit <br /> D. Underground Ducts Crossing Paved Paths Walks and Driveways: [PVC-80] [PVC-40] <br /> [direct buried] [encased in reinforced concrete]. <br /> E. Underground Ducts Crossing Roadways and Railroads: [PVC-80] [PVC-40], encased <br /> in reinforced concrete. <br /> F. Stub-ups: Concrete encased, [PVC-80] [PVC-40] [ERMC-S] [ERMC-S-PVC] [IMC]. <br /> 3.2 FIELD QUALITY CONTROL <br /> A. Acceptance Testing Preparation: <br /> B. Tests and Inspections: <br /> 1. Demonstrate capability and compliance with requirements on completion of <br /> installation of underground duct, duct bank, and utility structures. <br /> 2. Pull solid aluminum or wood test mandrel through duct to prove joint integrity and <br /> adequate bend radii, and test for out-of-round duct. Provide minimum 12 inches <br /> long mandrel equal to duct size minus 1/4 inch. If obstructions are indicated, <br /> remove obstructions and retest. <br /> 3. Test manhole and handhole grounding to ensure electrical continuity of <br /> grounding and bonding connections. Measure and report ground resistance as <br /> specified in Section 260526 "Grounding and Bonding for Electrical Systems." <br /> C. Nonconforming Work: <br /> 1. Underground ducts, raceways, and structures will be considered defective if they <br /> do not pass tests and inspections. <br /> 2. Correct deficiencies and retest as specified above to demonstrate compliance. <br /> D. Field Quality-Control Reports: Collect, assemble, and submit test and inspection <br /> reports. <br /> E. Manufacturer Services: Engage factory-authorized service representative to support <br /> field tests and inspections. <br /> 1. Manufacturer's Field Reports for Field Quality-Control Support: Prepare and <br /> submit report after each visit by factory-authorized service representative, <br /> documenting activities performed at Project site. <br /> 3.3 CLEANING <br /> A. Pull leather-washer-type duct cleaner, with graduated washer sizes, through full length <br /> of duct until duct cleaner indicates that duct is clear of dirt and debris. Follow with <br /> rubber duct swab for final cleaning and to assist in spreading lubricant throughout <br /> ducts. <br /> B. Clean internal surfaces of manholes, including sump, and building interiors affected by <br /> Work. <br /> 1. Sweep site, removing dirt and debris. <br /> 2. Remove foreign material. <br /> 26 05 43 - 5 UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL SYSTEMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.