My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 26 05 53 - 1 <br /> Inductive Charging Infrastructure for Everett Transit <br /> SECTION 260553 - IDENTIFICATION FOR ELECTRICAL SYSTEMS <br /> PART I -GENERAL <br /> 1.1 SUMMARY <br /> A. Section Includes: <br /> 1. Labels. <br /> 2. Extruded insulating tubing. <br /> 3. Bands. <br /> 4. Tapes and stencils. <br /> 5. Tags. <br /> 6. Signs. <br /> 7. Cable ties. <br /> B. Related Requirements: <br /> 1. Section 260010 "Supplemental Requirements for Electrical" for additional <br /> abbreviations, definitions, submittals, qualifications, testing agencies, and other <br /> Project requirements applicable to Work specified in this Section. <br /> 1.2 ACTION SUBMITTALS <br /> A. Product Data: For each type of product. <br /> B. Samples: For each type of label and sign to illustrate composition, size, colors, lettering <br /> style, mounting provisions, and graphic features of identification products. <br /> C. Identification Schedule: For each piece of electrical equipment and electrical system <br /> components to be index of nomenclature for electrical equipment and system <br /> components used in identification signs and labels. Use same designations indicated <br /> on Drawings. <br /> PART 2 - PRODUCTS <br /> 2.1 LABELS <br /> A. Performance Criteria: <br /> 1. Regulatory Requirements: Listed and labeled in accordance with NFPA 70, by <br /> qualified electrical testing laboratory recognized by authorities having jurisdiction, <br /> and marked for intended location and application. <br /> B. Vinyl Wraparound Labels: Preprinted, flexible labels laminated with clear, weather- and <br /> chemical-resistant coating and matching wraparound clear adhesive tape for securing <br /> label ends. <br /> 26 05 53 - 1 IDENTIFICATION FOR ELECTRICAL SYSTEMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.