My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 26 05 73.16 - 1 <br /> Inductive Charging Infrastructure for Everett Transit <br /> SECTION 260573.16 - COORDINATION STUDIES <br /> PART 1 -GENERAL <br /> 1.1 SUMMARY <br /> A. Section Includes: <br /> 1. Computer-based, overcurrent protective device coordination studies to determine <br /> overcurrent protective devices and to determine overcurrent protective device <br /> settings for selective tripping. <br /> a. Study results must be used to determine coordination of series-rated <br /> devices. <br /> B. Related Requirements: <br /> 1. Section 260010 "Supplemental Requirements for Electrical" for additional <br /> abbreviations, definitions, submittals, qualifications, testing agencies, and other <br /> Project requirements applicable to Work specified in this Section. <br /> 2. Section 260573.13 "Short-Circuit Studies" for fault-current studies. <br /> 3. Section 260573.19 "Arc-Flash Hazard Analysis"for arc-flash studies. <br /> 1.2 DEFINITIONS <br /> A. Existing to Remain: Existing items of construction that are not to be removed and that <br /> are not otherwise indicated to be removed, removed and salvaged, or removed and <br /> reinstalled. Existing to remain items must remain functional throughout construction <br /> period. <br /> B. One-Line Diagram: A diagram that shows, by means of single lines and graphic <br /> symbols, the course of electric circuit or system of circuits and the component devices <br /> or parts used therein. <br /> C. Protective Device: A device that senses when abnormal current flow exists and then <br /> removes the affected portion of the circuit from the system. <br /> D. SCCR: Short-circuit current rating. <br /> E. Service: The conductors and equipment for delivering electric energy from the serving <br /> utility to the wiring system of the premises served. <br /> F. Single-Line Diagram: See "One-Line Diagram." <br /> 1.3 ACTION SUBMITTALS <br /> A. Product Data: <br /> 1. For power system analysis software to be used for studies. <br /> 26 05 73.16 - 1 COORDINATION STUDIES <br />
The URL can be used to link to this page
Your browser does not support the video tag.