My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 26 05 73.16 -2 <br /> Inductive Charging Infrastructure for Everett Transit <br /> B. Coordination Study Report: <br /> 1. Submit the following after approval of system protective devices submittals. <br /> Submittals must be in digital form. <br /> a. Coordination-study input data, including completed computer program input <br /> data sheets. <br /> b. Study and equipment evaluation reports. <br /> c. Submit study report for action prior to receiving final approval of distribution <br /> equipment submittals. If formal completion of studies will cause delay in <br /> equipment manufacturing, obtain approval from Architect for preliminary <br /> submittal of sufficient study data to ensure that selection of devices and <br /> associated characteristics is satisfactory. <br /> d. Revised one-line diagram, reflecting field investigation results and results <br /> of coordination study. <br /> 1.4 INFORMATIONAL SUBMITTALS <br /> A. Product Certificates: For overcurrent protective device coordination study software, <br /> certifying compliance with IEEE 399. <br /> 1.5 QUALITY ASSURANCE <br /> A. Studies must be performed using commercially developed and distributed software <br /> designed specifically for power system analysis. <br /> B. Software algorithms must comply with requirements of standards and guides specified <br /> in this Section. <br /> C. Manual calculations are unacceptable. <br /> 1.6 REGULATORY AGENCY APPROVALS <br /> A. Submittals for coordination study requiring approval by authorities having jurisdiction <br /> must be signed and sealed by qualified electrical professional engineer responsible for <br /> their preparation. <br /> B. Submittals for coordination study require action by Architect prior to submitting for <br /> approval by authorities having jurisdiction. <br /> PART 2 - PRODUCTS <br /> 2.1 POWER SYSTEM ANALYSIS SOFTWARE <br /> A. Comply with IEEE 242 and IEEE 399. <br /> B. Analytical features of device coordination study computer software program must have <br /> capability to calculate "mandatory," "very desirable," and "desirable" features as listed <br /> in IEEE 399. <br /> 26 05 73.16 -2 COORDINATION STUDIES <br />
The URL can be used to link to this page
Your browser does not support the video tag.