My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 26 05 73.19 - 6 <br /> Inductive Charging Infrastructure for Everett Transit <br /> 3.3 POWER SYSTEM DATA <br /> A. Obtain data necessary for conduct of arc-flash hazard analysis. <br /> 1. Verify completeness of data supplied on one-line diagram on Drawings and <br /> under"Preparatory Studies" Paragraph in "Arc-Flash Hazard Analysis" Article. <br /> 2. For new equipment, use characteristics from approved submittals under <br /> provisions of action submittals and information submittals for this Project. <br /> 3. For existing equipment, whether or not relocated, obtain required electrical <br /> distribution system data by field investigation and surveys conducted by qualified <br /> technicians and engineers. <br /> B. Electrical Survey Data: Gather and tabulate the following input data to support study. <br /> Comply with recommendations in IEEE 1584 and NFPA 70E as to amount of detail that <br /> is required to be acquired in field. Field data gathering must be under direct supervision <br /> and control of engineer in charge of performing study, and must be by, or under <br /> supervision of, qualified electrical professional engineer. Data include, but are not <br /> limited to, the following: <br /> 1. Product Data for overcurrent protective devices specified in other Sections and <br /> involved in overcurrent protective device coordination studies. Use equipment <br /> designation tags that are consistent with electrical distribution system diagrams, <br /> overcurrent protective device submittals, input and output data, and <br /> recommended device settings. <br /> 2. Obtain electrical power utility impedance or available short circuit current at <br /> service. <br /> 3. Power sources and ties. <br /> 4. Short-circuit current at each system bus (three phase and line to ground). <br /> 5. Full-load current of loads. <br /> 6. Voltage level at each bus. <br /> 7. For transformers, include kVA, primary and secondary voltages, connection type, <br /> impedance, X/R ratio, taps measured in percent, and phase shift. <br /> 8. For reactors, provide manufacturer and model designation, voltage rating and <br /> impedance. <br /> 9. For circuit breakers and fuses, provide manufacturer and model designation. List <br /> type of breaker, type of trip and available range of settings, SCCR, current rating, <br /> and breaker settings. <br /> 10. Generator short-circuit current contribution data, including short-circuit reactance, <br /> rated kVA, rated voltage, and X/R ratio. <br /> 11. For relays, provide manufacturer and model designation, current transformer <br /> ratios, potential transformer ratios, and relay settings. <br /> 12. Busway manufacturer and model designation, current rating, impedance, lengths, <br /> size, and conductor material. <br /> 13. Motor horsepower and NEMA MG 1 code letter designation. <br /> 14. Low-voltage conductor sizes, lengths, number, conductor material and conduit <br /> material (magnetic or nonmagnetic). <br /> 15. Medium-voltage conductor sizes, lengths, conductor material, conductor <br /> construction and metallic shield performance parameters, and conduit material <br /> (magnetic or nonmagnetic). <br /> 26 05 73.19 - 6 ARC-FLASH HAZARD ANALYSIS <br />
The URL can be used to link to this page
Your browser does not support the video tag.