My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 26 22 13 - 1 <br /> Inductive Charging Infrastructure for Everett Transit <br /> SECTION 262213 - LOW-VOLTAGE DISTRIBUTION TRANSFORMERS <br /> PART 1 -GENERAL <br /> 1.1 SUMMARY <br /> A. Section Includes: <br /> 1. Isolation, NEMA 3R, dry-type 500kVA, transformer with 480V primary and <br /> 480/277V secondary voltage. <br /> B. Related Requirements: <br /> 1. Section 260010 "Supplemental Requirements for Electrical" for additional <br /> abbreviations, definitions, submittals, qualifications, testing agencies, and other <br /> Project requirements applicable to Work specified in this Section. <br /> C. Data: <br /> 1. For the isolation transformer: <br /> a. Include construction details, material descriptions, dimensions of individual <br /> components and profiles, and finishes. <br /> b. Include rated nameplate data, capacities, weights, dimensions, minimum <br /> clearances, installed devices and features, and performance of this <br /> isolation transformer. <br /> D. Shop Drawings: <br /> 1. Detail equipment assemblies and indicate dimensions, weights, loads, required <br /> clearances, method of field assembly, components, and location and size of field <br /> connections. <br /> 2. Vibration Isolation Base Details: Detail fabrication including anchorages and <br /> attachments to structure and to supported equipment. <br /> 3. Include diagrams for power, signal, and control wiring. <br /> E. Field Quality-Control Submittals: <br /> 1. Field quality-control reports. <br /> 1.2 INFORMATIONAL SUBMITTALS <br /> A. Manufacturers' Published Instructions: Record copy of official installation and testing <br /> instructions issued to Installer by manufacturer for the following: <br /> 1. Transformer temporary heating, working clearances, anchoring, torque values, <br /> and insulation-resistance testing. <br /> B. Source quality-control reports. <br /> 26 22 13 - 1 LOW-VOLTAGE DISTRIBUTION TRANSFORMERS <br />
The URL can be used to link to this page
Your browser does not support the video tag.