Laserfiche WebLink
City of Everett 26 22 13 - 7 <br /> Inductive Charging Infrastructure for Everett Transit <br /> B. Output Settings Report: Prepare written report recording output voltages and tap <br /> settings. <br /> 3.6 CLEANING <br /> A. Vacuum dirt and debris; do not use compressed air to assist in cleaning. <br /> 3.7 MAINTENANCE <br /> A. Infrared Scanning: Two months after Substantial Completion, perform infrared scan of <br /> transformer connections. <br /> 1. Use infrared-scanning device designed to measure temperature or detect <br /> significant deviations from normal values. Provide documentation of device <br /> calibration. <br /> 2. Perform two follow-up infrared scans of transformers, one at four months and <br /> another at 11 months after Substantial Completion. <br /> 3. Prepare certified report identifying transformer checked and describing results of <br /> scanning. Include notation of deficiencies detected, remedial actions taken, and <br /> scanning observations after remedial action. <br /> END OF SECTION 262213 <br /> 26 22 13 - 7 LOW-VOLTAGE DISTRIBUTION TRANSFORMERS <br />