My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 26 24 16 - 1 <br /> Inductive Charging Infrastructure for Everett Transit <br /> SECTION 262416 - PANELBOARDS <br /> PART 1 -GENERAL <br /> 1.1 SUMMARY <br /> A. Section Includes: <br /> 1. Power panelboard. <br /> 2. Disconnecting and overcurrent protective devices. <br /> B. Related Requirements: <br /> 1. Section 260010 "Supplemental Requirements for Electrical" for additional <br /> abbreviations, definitions, submittals, qualifications, testing agencies, and other <br /> Project requirements applicable to Work specified in this Section. <br /> 1.2 DEFINITIONS <br /> A. GFP: Ground-fault equipment protection. <br /> B. MCCB: Molded-case circuit breaker. <br /> C. VPR: Voltage protection rating. <br /> 1.3 ACTION SUBMITTALS <br /> A. Product Data: <br /> 1. Power panelboards. <br /> 2. Disconnecting and overcurrent protective devices. <br /> 3. Include materials, switching and overcurrent protective devices, SPDs, <br /> accessories, and components indicated. <br /> 4. Include dimensions and manufacturers' technical data on features, performance, <br /> electrical characteristics, ratings, and finishes. <br /> B. Shop Drawings: For the panelboard and related equipment. <br /> 1. Include dimensioned plans, elevations, sections, and details. <br /> 2. Show tabulations of installed devices with nameplates, conductor termination <br /> sizes, equipment features, and ratings. <br /> 3. Detail enclosure types including mounting and anchorage, environmental <br /> protection, knockouts, corner treatments, covers and doors, gaskets, hinges, and <br /> locks. <br /> 4. Detail bus configuration, current, and voltage ratings. <br /> 5. Short-circuit current rating of panelboards and overcurrent protective devices. <br /> 6. Include evidence of listing, by qualified electrical testing laboratory recognized by <br /> authorities having jurisdiction, for series rating of installed devices. <br /> 7. Include evidence of listing, by qualified electrical testing laboratory recognized by <br /> authorities having jurisdiction, for SPD as installed in panelboard. <br /> 26 24 16 - 1 PANELBOARDS <br />
The URL can be used to link to this page
Your browser does not support the video tag.