My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 26 28 16 - 9 <br /> Inductive Charging Infrastructure for Everett Transit <br /> 3.6 ADJUSTING <br /> A. Adjust moving parts and operable components to function smoothly, and lubricate as <br /> recommended by manufacturer. <br /> B. Set field-adjustable circuit-breaker trip ranges as specified in Section 260573.16 <br /> "Coordination Studies." <br /> 3.7 PROTECTION <br /> A. After installation, protect enclosed switches and circuit breakers from construction <br /> activities. Remove and replace items that are contaminated, defaced, damaged, or <br /> otherwise caused to be unfit for use prior to acceptance by Owner. <br /> 3.8 MAINTENANCE <br /> A. Infrared Scanning of Enclosed Switches and Breakers: Two months after Substantial <br /> Completion, perform infrared scan of joints and connections. Remove covers so joints <br /> and connections are accessible to portable scanner. Take visible light photographs at <br /> same locations and orientations as infrared scans for documentation to ensure follow- <br /> on scans match same conditions for valid comparison. <br /> 1. Instruments and Equipment: Use infrared scanning device designed to measure <br /> temperature or to detect significant deviations from normal values. Provide <br /> calibration record for device. <br /> 2. Follow-up Infrared Scanning: Perform two follow-up infrared scans of enclosed <br /> switches and breakers, one at four months and another at 11 months after <br /> Substantial Completion. <br /> 3. Instrument: Use infrared-scanning device designed to measure temperature or to <br /> detect significant deviations from normal values. Provide documentation of <br /> device calibration. <br /> 4. Report: Prepare certified report that identifies units checked and that describes <br /> scanning results. Include notation of deficiencies detected, remedial actions <br /> taken, and scanning observations after remedial action. <br /> END OF SECTION 262816 <br /> 26 28 16 - 9 ENCLOSED SWITCHES AND CIRCUIT BREAKERS <br />
The URL can be used to link to this page
Your browser does not support the video tag.