My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 31 00 00 - 3 <br /> Inductive Charging Infrastructure for Everett Transit <br /> 2. Elsewhere, backfill and compact unauthorized excavations with structural fill as <br /> specified herein. <br /> B. Overexcavation: In certain areas where soft spots occur in the subgrade, satisfactory <br /> sub-grade shall be achieved by overexcavation and replacement with structural fill <br /> material or lean mix concrete. <br /> 1. Location and extent of soft spot areas to be verified by Owner's Geotechnical <br /> Consultant in the field. <br /> C. Stability of Excavations: Slope the sides of excavations to comply with local codes and <br /> ordinances having jurisdiction. Shore and brace where sloping is not possible because <br /> of space restrictions or stability of material excavated. Maintain sides and slopes of <br /> excavations in a safe condition until completion of backfilling. <br /> D. Shoring and Bracing: Provide shoring and bracing to comply with local codes and <br /> authorities having jurisdiction. Provide materials for shoring and bracing, such as sheet <br /> piling, uprights, stringers and cross-braces, in good serviceable condition. Maintain <br /> shoring and bracing in excavations regardless of the time period excavations will be <br /> open. Carry down shoring and bracing as the excavation progresses. <br /> E. Dewatering: Prevent surface water and subsurface or ground water from flowing into <br /> excavations and from flooding project site and surrounding area. <br /> 1. Do not allow water to accumulate in excavations. Remove water to prevent softening <br /> of foundation bottoms, undercutting footings and soil changes detrimental to stability <br /> of subgrades and foundations. Provide and maintain pumps, well points, sumps, <br /> suction and discharge lines and other dewatering system components necessary to <br /> convey water away from excavations. <br /> 2. Establish and maintain temporary drainage ditches and other diversions outside <br /> excavation limits for each structure to convey water. Do not use trench excavations <br /> as temporary drainage ditches. <br /> F. Material Storage: Stockpile excavated materials as required. Place, grade, shape and <br /> cover stockpiles for proper drainage and to prevent accumulation of excess moisture. <br /> 1. Locate and retain soil materials away from edge of excavations. <br /> 2. Dispose of excess soil material and waste materials legally off-site. <br /> G. Excavation for Buildings and Retaining Walls <br /> 1. Conform to elevations and dimensions shown within a tolerance of plus or minus 0.10- <br /> foot, and extending a sufficient distance from footings and foundations to permit <br /> placing and removal of concrete formwork, installation of services, other construction, <br /> and inspection. <br /> 2. In excavating for footings and foundations, take care not to disturb the bottom of the <br /> excavation. Excavate by hand to final grade just before concrete reinforcement is <br /> placed. Trim bottoms to required lines and grades to leave solid base to receive <br /> 31 00 00 - 3 EARTHWORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.