My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
该页面上没有批注。
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 31 00 00 - 2 <br /> Inductive Charging Infrastructure for Everett Transit <br /> 2.3 TOPSOIL <br /> A. Topsoil shall be on-site or imported material that conform with Section 8-02.3(4) of the <br /> WSDOT Standard Specifications. <br /> 2.4 GRAVEL BACKFILL FOR PIPE ZONE BEDDING <br /> A. Gravel backfill for pipe zone bedding shall conform with Section 9-03.12(3) of the <br /> WSDOT Standard Specifications. <br /> 2.5 SAND <br /> A. Sand shall conform with Section 9-03.13 of the WSDOT Standard Specifications. <br /> 2.6 GRAVEL BACKFILL FOR WALLS <br /> A. Gravel backfill for walls shall conform to Section 9-03.12(2) of the WSDOT Standard <br /> Specifications. <br /> 2.7 GRAVEL BACKFILL FOR DRAINS <br /> A. Gravel backfill for drains shall conform to Section 9-03.12(4) of the WSDOT Standard <br /> Specifications. <br /> 2.8 QUARRY SPALLS <br /> A. Quarry spalls shall be crushed quarry rock. Spalls shall be hard, sound and <br /> unweathered. Quarry spalls shall meet the following gradation requirements: <br /> Sieve Size Percent Passing <br /> 6-inch 100 <br /> 3-inch 40 max. <br /> 3/4-inch 10 max. <br /> 2.9 CONTROLLED DENSITY FILL (CDF) <br /> A. CDF shall conform to section 2-09.3(1)E of the WSDOT Standard Specifications. <br /> PART 3 - EXECUTION <br /> 3.1 EXCAVATION <br /> A. Unauthorized excavation consists of removal of materials beyond indicated subgrade <br /> elevations or dimensions without specific direction of the Owner's Representative. <br /> Unauthorized excavation, as well as remedial work directed by the Owner's <br /> Representative, shall be at no change in contract amount. <br /> 1. Under footings, foundation bases, or retaining walls, fill unauthorized excavation with <br /> CDF or lean mix concrete. The bottom width of the excavation shall be defined by a <br /> line extending downward and out from the outer edge of the footing at an angle of <br /> 1H:1V. <br /> 31 00 00 - 2 EARTHWORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.