My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 32 16 13A- 1 <br /> Inductive Charging Infrastructure for Everett Transit <br /> SECTION 32 16 13A -CONCRETE CURBS AND GUTTERS <br /> PART 1 -GENERAL <br /> 1.1 SUMMARY <br /> A. This Section includes requirements for constructing cement concrete curbs and gutters. <br /> 1.2 REFERENCES <br /> A. This Section incorporates by reference the latest revisions or the dated references (as <br /> noted) of the following documents. <br /> 1. ASTM International (ASTM) <br /> a. ASTM A615/A615M Standard Specification for Deformed and Plain Carbon- <br /> Steel Bars for Concrete Reinforcement <br /> b. ASTM C143/C143M Standard Test Method for Slump of Hydraulic-Cement <br /> Concrete <br /> c. ASTM C150/C150M Standard Specification for Portland Cement <br /> d. ASTM C881/C881M Standard Specification for Epoxy-Resin-Base Bonding <br /> Systems for Concrete <br /> 2. Washington State Department of Transportation (WSDOT) <br /> a. WSDOT Standard Specifications for Road, Bridge, and Municipal <br /> Construction latest version <br /> b. WSDOT Standard Plans <br /> 1.3 SUBMITTALS AND TRANSMITTALS <br /> A. Submit the following: <br /> 1. Concrete Mix Design: Provide concrete mix design and test results. <br /> B. Transmit the following: <br /> 1. Product Data: Provide manufacturers' product data for all materials being used. <br /> PART 2 - PRODUCTS <br /> 2.1 MATERIALS <br /> A. Concrete for Concrete Curb: <br /> 1. Minimum 28-day compressive strength of 3,000 pounds per square inch. <br /> 2. Slump (ASTM C143/C143M) not to exceed 1 inch. <br /> 3. Maximum coarse aggregate 3/4 inch. <br /> 32 16 13A- 1 CONCRETE CURB AND GUTTERS <br />
The URL can be used to link to this page
Your browser does not support the video tag.