Laserfiche WebLink
City of Everett 32 16 13A- 3 <br /> Inductive Charging Infrastructure for Everett Transit <br /> C. Cast-in-Place Curbs and Gutters: <br /> 1. Construction shall be in accordance with WSDOT Standards Specifications <br /> Section 8-04. <br /> 3.2 FIELD QUALITY CONTROL <br /> A. Ensure that when checked with a 10-foot straightedge, grade does not deviate more than <br /> 1/8-inch, and alignment does not vary more than 1/4 inch. <br /> END OF SECTION <br /> 32 16 13A- 3 CONCRETE CURB AND GUTTERS <br />