My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 00 68 00 - 1 <br /> Inductive Charging Infrastructure for Everett Transit <br /> SECTION 00 68 00 -APPRENTICE UTILIZATION AND REPORTING <br /> 1. GENERAL <br /> 1.1. The Contractor shall use good faith efforts to utilize apprentices registered with the <br /> Washington State Apprenticeship and Training Council ("SAC"), for fifteen percent (15%) <br /> of the total contract labor hours utilized on the Project. <br /> 1.2 The Contractor shall make good faith efforts to: <br /> 1.2.1 Equally distribute the apprentice hours worked among each trade/craft and <br /> consistent with the apprentice utilization percentage requirement set forth herein. <br /> 1.2.2 Use reasonable and practicable means to recruit and hire apprentices to achieve <br /> the apprentice utilization goal. <br /> 1.2.3 Use reasonable and practicable means to recruit and hire minority and women <br /> rapprentices for the Project. <br /> 1.2.4 Comply with the apprenticeship training standards for each trade/craft <br /> classification used on the Project, as set forth by the Washington State <br /> Department of Labor and Industries. <br /> 1.3 It is normally expected that an apprentice will begin training on the Project as soon as <br /> feasible after start of work, utilizing the skill involved and remain on the Project as long <br /> as training opportunities exist in the work classification or until the completion of the <br /> training program. It is not required that all apprentices be retained for the entire length of <br /> the Contract. <br /> 2. CALCULATION OF LABOR HOURS AND GOALS <br /> 2.1 Total contract labor hours include additional hours worked as a result of change orders. <br /> 2.2 Total contract labor hours exclude hours worked by foremen, superintendents, <br /> supervisors, owners, and workers who are not subject to prevailing wage requirements. <br /> 2.3 Total contract labor hours shall include the hours worked by supervisors, foremen, and <br /> superintendents if they are subject to prevailing wage requirements pursuant to the <br /> following criteria of WAC 296-127-015: <br /> I <br /> 00 68 00 - 1 APPRENTICE UTILIZATION AND REPORTING <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.