My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 00 7200 - 6 <br /> 1 <br /> Approved Shop Drawings,other Contractor's Submittals,and the reports and drawings of subsurface and <br /> physical conditions are not Contract Documents. I <br /> 2. SPECIFICATIONS AND DRAWINGS <br /> 2.1. INTERPRETATION OF SPECIFICATIONS AND DRAWINGS 1 <br /> The Specifications and Drawings are intended to be explanatory and supportive of each other. Work <br /> specified on the Drawings and not in the Specifications,or vice versa,shall be executed as if specified in <br /> both.In the event the Work to be done or matters relative thereto are not sufficiently detailed or <br /> explained in the Contract Documents,the Contractor shall immediately ask the Owner's Representative <br /> for further explanation and shall comply with such explanation. In the event of doubt or question arising <br /> respecting the true meaning of the Specifications or Drawings,Contractor shall refer to the Owner's <br /> Representative for his or her decision. <br /> The Specifications may vary in form, format and style.Some specification sections are written in varying <br /> degrees of streamlined or declarative style and some sections may be relatively narrative by comparison. <br /> Omissions of such words and phrases as"the Contractor shall," "in conformity with," "as shown,"or"as <br /> specified"are intentional in streamlined sections. Omitted words and phrases shall be supplied by <br /> inference. Similar types of provisions may appear in various parts of a section or articles within a part <br /> depending on the format of the section. The Contractor shall not take advantage of any variation of form, <br /> format or style in making claims for extra Work. <br /> The cross referencing of specification sections under the subparagraph heading"Related Sections include ' <br /> but are not necessarily limited to:"and elsewhere within each specification section is provided as an aid <br /> and convenience to the Contractor.The Contractor shall not rely on the cross referencing provided and <br /> shall be responsible to coordinate the entire Work under the Contract Documents and provide a complete <br /> Project whether or not the cross referencing is provided in each section or whether or not the cross <br /> referencing is complete. <br /> Reference to standards, specifications,manuals,or codes of any technical society,organization,or <br /> association,or to Laws or Regulations,whether such reference be specific or by implication, shall mean <br /> the standard,specification,manual,code,or Laws or Regulations in effect at the time of opening of Bids <br /> (or on the Effective Date of the Agreement if there were no Bids),except as may be otherwise specifically <br /> stated in the Contract Documents. <br /> No provision of a standard,specification,manual or code,or an instruction of a Supplier shall be effective <br /> to change the duties or responsibilities of Owner,Contractor,or Owner's Representative,or their <br /> Subcontractors,consultants,agents,or employees from those set forth in the Contract Documents.No <br /> such provision or instruction shall be effective to assign to Owner,or Owner's Representative,or their <br /> related entities,any duty or authority to supervise or direct the performance of the Work or any duty or <br /> authority to undertake responsibility inconsistent with the provisions of the Contract Documents. <br /> 2.2. DIVISION OF SPECIFICATIONS AND DRAWINGS <br /> Specifications and Drawings are divided into groups for convenience. These divisions are not for the <br /> purpose of apportioning Work or responsibility for Work among Subcontractors, Suppliers and <br /> manufacturers. The Contractor is responsible for all Work shown or described,regardless of location(s) <br /> in the Contract Documents. <br /> 2.3. DISCREPANCIES IN SPECIFICATIONS AND DRAWINGS <br /> 2.3.1. Errors and Omissions <br /> If the Contractor,in the course of the Work,becomes aware of any errors or omissions in the Contract 111 <br /> Documents or in the Owner's field work,he or she shall immediately inform the Owner's Representative <br /> in writing. The Owner's Representative will promptly review the matter and if he or she finds an error or <br /> 00 7200 - 6 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.