Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 7200 - 7 <br /> omission has been made,then he or she will determine the corrective actions and advise the Contractor <br /> ' accordingly.If the corrective work associated with an error or omission significantly increases or <br /> decreases the amount of Work called for in the Contract,the Owner will issue an appropriate Change <br /> Order.After discovery by the Contractor of an error or omission,related work performed by the <br /> Contractor shall be done at its risk unless authorized by the Owner's Representative and approved by the <br /> Owner. Omissions from the Drawings or Specifications or the misdescription of details of Work that are <br /> manifestly necessary to carry out the intent of the Drawings and Specifications,or that are customarily <br /> performed,shall not relieve the Contractor from performing such omitted or misdescribed details of the <br /> ' Work,but they shall be performed as if fully and correctly set forth and described in the Drawings and <br /> Specifications. <br /> 2.3.2. Conflicting Provisions <br /> Figure dimensions on drawings shall govern over scale dimensions and detail drawings shall govern over <br /> general drawings.In the event an item of Work is described differently in two or more locations on the <br /> Drawings and in the Specifications,the Contractor shall,upon request of the Owner's Representative, <br /> submit in writing to the Owner's Representative the description upon which the Contractor relied in <br /> preparing its Bid or laying out the Work. If the Owner's Representative directs the Contractor to perform <br /> Work in a manner other than that contemplated by the Contractor in preparing its Bid or laying out the <br /> ' Work,Change Order procedures will be followed.In this event,the Contractor shall submit to the <br /> Owner's Representative such supporting information,including bidding or layout documents,as may <br /> reasonably be necessary for the Owner's Representative to determine whether the Contract Sum is <br /> ' increased,decreased or unchanged by the Change Order. <br /> 2.3.3. Utilities <br /> 2.3.3.1 General <br /> The Owner has endeavored to determine the existence of utilities at the Site of the Work from the records <br /> of the owners of known utilities in the vicinity of the Work.The positions of these utilities as derived <br /> from such records are shown on the Drawings.No excavations were made to verify the locations shown <br /> for underground utilities.The service connections to these utilities are not shown on the Drawings.It <br /> shall be the responsibility of the Contractor to determine the exact location of utilities and service <br /> connections thereto. Such field verification must be performed in sufficient time so as not to impede the <br /> ' progress of the Work or fabrication of materials to be incorporated into the Work.The Contractor shall <br /> call the Utility Location Request Center(one call center)for location of utilities in the field not less than <br /> two(2)nor more than(10)ten business days before the scheduled date of commencement of excavation. <br /> The Contractor shall make its own investigations,including exploratory excavations,to determine the <br /> locations and type of existing utilities,including service connections,prior to commencing work that <br /> could result in damage to such utilities.The Contractor shall immediately notify the Owner's <br /> Representative as to any utility discovered by him in a different position than shown on the Drawings or <br /> ' which is not shown on the Drawings.No excavation shall begin until all known facilities in the <br /> excavation areas have been marked.Contractor shall coordinate its activities with the utility provider. <br /> Contractor shall bear the cost of maintaining utility service. <br /> ' The Contractor should be aware of,and comply with,Chapter 19.122 RCW,a law relating to <br /> underground utilities.The Owner shall not pay Contractor any of Contractor's cost of complying with <br /> this law,or repairing or indemnifying any damage or injury arising out of Contractor's failure to comply <br /> ' with this law. <br /> Owner does not represent or warrant who may be obligated to pay for the cost of relocation or temporary <br /> maintenance of the utility. Contractor shall investigate whether such cost must be borne by the owner of <br /> ' the utility. <br /> Governmental agencies and owners of utilities reserve the right to enter upon streets,alleys,rights-of- <br /> way,or easements for the purpose of making changes in their property made necessary by the Work and <br /> for the purpose of maintaining and making repairs to their property. <br /> 00 7200 - 7 GENERAL CONDITIONS <br />