My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 21 13- 1 <br /> Inductive Charging Infrastructure for Everett Transit <br /> SECTION 00 21 13 - INSTRUCTIONS TO BIDDERS <br /> PART 1 - GENERAL <br /> 1.1 GENERAL DESCRIPTION AND LOCATION OF PROJECT <br /> A. The Work to be performed will include furnishing all labor, materials and equipment <br /> necessary to perform all Work as required by the Contract in accordance with the <br /> Contract Documents. <br /> B. The Project Site is located at 3535 Riverfront Blvd, Everett WA. <br /> 1.2 PROJECT MANAGER <br /> A. Questions and inquiries about the Contract Documents should be directed to the <br /> attention of Vincent Bruscas, City of Everett Project Manager at(425)257-6292 or email <br /> vbruscas@everettwa.gov. <br /> 1.3 STANDARD SPECIFICATIONS <br /> A. The following other Specifications and Standard Plans shall apply to the extent to which <br /> they are called out in the Contract Documents. <br /> 1. WSDOT "2022 Standard Specifications for Road, Bridge and Municipal <br /> Construction", as amended by the APWA Supplements, hereinafter referred to as <br /> the"Standard Specifications." <br /> 2. City of Everett "Design and Construction Standards and Specifications" (Revised <br /> 1-08), as found online on the City's Website at: https://everettwa.gov/319/Bid- <br /> Opportunities <br /> 3. "Standard Plans for Road and Bridge Construction," latest edition as prepared by <br /> WSDOT. <br /> 4. "Manual on Uniform Traffic Control Devices" (MUTCD), latest edition. <br /> 5. APWA Standards, latest edition. <br /> 6. AWWA Standards, latest edition. <br /> 7. American Concrete Institute (ACI), latest edition <br /> 1.4 EXAMINATION OF SITE CONDITIONS, CONTRACT DOCUMENTS AND <br /> REGULATIONS <br /> A. Bidders shall inspect the Site of the Work and carefully review the Contract Documents <br /> to satisfy themselves, by personal examination, physical testing, or by such other means <br /> as they may prefer, of the location of the proposed Work, the actual physical conditions <br /> of and at the Site, surface and subsurface conditions, and conditions ordinarily to be <br /> encountered and generally recognized as inherent in the Work. If, during the course or <br /> as a result of such inspection, examination and testing, a Bidder finds facts or conditions <br /> that appear to conflict or are omitted from the Contract Documents, or with other data or <br /> 00 21 13 - 1 INSTRUCTIONS TO BIDDERS <br />
The URL can be used to link to this page
Your browser does not support the video tag.