Item/Task Document Reference Precon. Const. Specified Cost of Negotiated Const. Owner <br /> Services Cost Manager's General Work/MACC Support Manager's <br /> Fee Conditions Services Contingency <br /> In order to assist the GC/CM proposers in developing the cost associated with the segments of the fee proposals process and how costs are intended to be treated under the Contract Documents,the Owner is providing the <br /> following Cost Responsibility Matrix(CRM).The shaded and checked box indicates in what section the Owner expects the GC/CM proposer to apply the identified costs.This list is not intended to be a complete fist of activities and <br /> costs required to complete the project,but a guide outline.Proposers should refer to the Request for Final Proposals(RFFP)along with the Contract Documents(Agreement&General Conditions),including all addenda,to <br /> ascertain all of the full project scope requirements.In the event there is conflict or omitted items contained in the CRM,the Contract Documents shall govern.Note that there are some items listed in the CRM that are not <br /> specifically addressed in the RFFP or Contract Documents but have been added to this CRM to clarify scope.These clarified scope items shall be Included in the scope of services. <br /> Hazardous materials and unsuitable soils abatement,removal and disposal A201-10.3 x <br /> identified within the Contract Documents. <br /> Design Team(Architectural&Engineering)Services. N/A X <br /> Owner's Commissioning Authority. Spec Section 01 75 00 1.9 X <br /> GC/CM Advisory and Project Management Consultant,if applicable. N/A X <br /> Auditing Consultant. N/A X <br /> Page 12 RHS Draft Cost Resp Matrix 12-14-21.xlsx <br />